background image

– 6 –

Reach the Maximum

3. Montage der Puzzle-Platten

4. Bodenläufer auslegen

3. Assembly of the puzzle foam  

4. Lay out rollable mat   

Place the puzzle foam pieces on the floor elements, always two 
next to each other and with the white side up. The foam pieces 
must be alligned at 1 long and at 1 short side. 
If necessary: shorten the protruding foam parts on the two other 
sides with a cutter knife (pict. 5). 

A
Roll out the rollable mat (pict. 6a). 
Place it alligned at one short and the other two long sides. 

B
Rollable mats differ in length due to production-related issue. 
After laying the rollable mat onto the base construction, its length 
may still change during next 48 hours. Therefore let the rollable 
mat rest for 48 hours before starting the next step.

C
After this period: shorten the second short side with a cutter 
knife (pict. 6b). 

Legen Sie nun die Puzzle-Platten, immer zwei nebeneinander, und 
mit der weißen Seite nach oben auf die Bodenelemente.
Die Platten müssen an jeweils 1 langen und 1 kurzen Seite bündig 
anliegen. 
Bei Bedarf: kürzen Sie die überstehenden Schaumteile an den  
anderen 2 Seiten mit einem Cutter-Messer (Abb. 5).

A
Rollen Sie den Bodenläufer aus (Abb. 6a). Legen Sie ihn bündig an 
einer kurzen und den beiden langen Seiten an.  

B
Rollmatten haben fertigungsbedingt unterschiedliche Längen, die 
sich nach dem Auslegen innerhalb von 48 Stunden noch verändern 
können. Lassen Sie daher die Rollmatte für 48 h ausgelegt auf dem 
Unterkonstruktion ruhen, bevor Sie den nächsten Arbeitsschritt 
starten. 

C
Kürzen Sie nach dieser Zeit die zweite kurze Seite 
mit einem Cutter-Messer (Abb. 6b).

5

6a

6b

Top/ 

Oberseite

Bottom/ 

Unterseite

Содержание 1790764

Страница 1: ...uctions and user manual Tumbling Track Moscow Aufbau und Gebrauchsanleitung Tumblingbahn Moskau Montiert 1790764 12 m 10 Elemente 1790766 14 m 12 Elemente 1790765 18 m 15 Elemente Bausatz 1790762 12 m...

Страница 2: ...________________________________________________S 8 Warning___________________________________________________ S 9 Inhaltsverzeichnis Beschreibung___________________________________________ S 2 3 Lief...

Страница 3: ...790770 14 m 12 Elemente 1790760 18 m 15 Elemente Ben tigter Platzbedarf L nge der Bahn x 2 m Breite x 20 cm H he Description Same composition as FIG certified elastic swing floor Moscow Water resistan...

Страница 4: ...8 x 38 x Tension straps Spanngurte 3x 1 1500 mm 3x 1300 mm 3x 13600 mm 3x 1300 mm 3 x 17500 mm 3x 1300 mm 3x 1 1500 mm 3x 1300 mm 3x 13600 mm 3x 1300 mm 3 x 17500 mm 3x 1300 mm Brackets B gel 6 x 6 x...

Страница 5: ...prings in the already mounted spring retainers on the element and mount the black spring retainer caps to the springs You must hear a clear click sound pict 2 Afterwards turn around the elements Welch...

Страница 6: ...the connection straps between the holes in the first and last element Put the strap through the hole pict 4b The hook at the end of the strap must face downsides Hook the end of the strap in a bracket...

Страница 7: ...hours before starting the next step C After this period shorten the second short side with a cutter knife pict 6b Legen Sie nun die Puzzle Platten immer zwei nebeneinander und mit der wei en Seite nac...

Страница 8: ...sing a cutter knife Attach the blue PVC skirting pict 8c Fixieren Sie den Bodenl ufer in dem Sie rundherum Klettband streifen anbringen Platzieren Sie das Klettband 5 cm von der Kante entfernt auf dem...

Страница 9: ...eine andere mechanische oder chemische Reinigung Lagern Sie die Bodenplatten sowie den Bodenl ufer immer senkrecht stehend Um Besch digungen zu vermeiden wird der L ufer mit der Nadelfilz Seite nach a...

Страница 10: ...uses and results in a shortened lifespan WARNUNG Beim Benutzen dieses Turnger tes bernehmen Sie ein Verletzungsrisiko Um dieses Risiko minimal zu halten und um den sicheren Betrieb des Ger ts zu gew h...

Отзывы: