Spiderbeam 160m Vertical Model 160-18-4WTH

 

23  

        

                                    160-18-4WTH Manual, Ver. 1.7                                         17-JULY-2021 

3.1.4.1.  Guy Belt Method:

 

 

Attach  each  of  the  4  upper  2mm  Kevlar  guy  ropes  to  one  arm  of  the  upper  guy  belt, 
using a 

“Bowline”

 knot to secure them.  See APPENDIX for knot instructions. 

 

Repeat these steps for the lower guy ropes.

 

- or -

 

3.1.4.2.  Short Rope Stubs Method:

 

 

Attach  the  two  short  pieces  of  Polyester  rope  (about  80  cm  long)  to  the  pole  using  a 

“Square  Knot”

  for  each,  positioning  the  two  knots  90°  apart.    See  APPENDIX  for  knot 

instructions.  You will have 4 short stubs of rope hanging down, each rotated 90 degrees 
from the next.  See photo page 10, paragraph 2.4.3. 

 

Attach  each  of  the  4  upper  2mm  Kevlar  guy  ropes  to  one  of  the  stubs  using 

a  “Sheet 

Bend”

 knot to secure them.  See APPENDIX for knot instructions. 

 

Repeat these steps for the lower guy ropes.

 

3.2 

Special Instructions for Erecting the Pole in Windy Conditions

 

This is very important and if you are not sure whether it is too windy or not, then assume it is 
too windy and PLEASE follow these special instructions: 

 

First  of  all,  if  there  is  a  storm  with  very  high  winds,  it  is  probably  better  to  wait 
another day until the storm has passed. When erecting the pole in high winds, you 

must

 have one or two people to help you. 

 

If  it  is  just  a  windy  day,  then  you  will  need  to  temporarily  fasten  the  4  upper  guy 
ropes  to  their  ground  stakes  as  soon  as  you  can,  during  the  process  of  raising  the 
pole.  

 

Continue with the next step, which is directly after fastening the 4 upper guy ropes 
to the guy belts or guy ropes in section 3.1.4.1 or 3.1.4.2.  

 

After fastening the upper 4 guy ropes to segment #9, raise segment #8, dressing the 
wire down it.  Temporarily tape the wire to the pole with electrical tape. 

 

Now fasten all 4 of the upper guy ropes to their ground stakes, leaving about  2.5m 
(8

) of slack in each rope.  To do this, first pull the slack out of the rope, making sure 

the pole  is  still  straight, not bent,  and  then  loosen  the  rope by  2.5m  and  fasten  it.  
This leaves about 2.5m of slack in the rope.  

Do this for all 4 top guy ropes.

 

Содержание 160-18-4WTH

Страница 1: ...Spiderbeam 160m Vertical Model 160 18 4WTH 1 160 18 4WTH Manual Ver 1 7 17 JULY 2021 Spiderbeam 160m Vertical Model 160 18 4WTH shown here without radials...

Страница 2: ...Spiderbeam 160m Vertical Model 160 18 4WTH 2 160 18 4WTH Manual Ver 1 7 17 JULY 2021 VERTICAL CONSTRUCTION GUIDE Ver 1 7...

Страница 3: ...tion 8 2 3 Attaching the Pole to the Base Stake 8 2 4 Raising the Pole for the First Time 9 2 4 1 Raising and Clamping the Pole Segments 9 2 4 2 Using the Optional Guy Belt Set 10 2 4 3 Using 6mm Rope...

Страница 4: ...2 Special Instructions for Erecting the Pole in Windy Conditions 23 3 3 Fastening the Top Hats to their Ground Stakes 24 3 4 Adjusting Guy ropes and Top Hat Lines 24 3 5 Installing the Radial Network...

Страница 5: ...uare not rectangular Minor deviations from this will not cause too much loss in performance If you have more space take advantage of it by placing the ground stakes supporting the top hat wires farthe...

Страница 6: ...eries of 7 articles for QEX magazine 1 3 Material Description It is of utmost importance to keep the material used near the top of the pole as lightweight as possible yet strong enough to endure the s...

Страница 7: ...installation Prior to installation you can pre cut your wires and ropes but in most cases due to the long lengths used it is easier to cut them in the field than in the house FORMULA FOR SUCCESS MEAS...

Страница 8: ...18m pole and using a sledge hammer pre drill a hole in the ground for the installation of the wooden stake by pounding a 30mm to 40mm steel pipe about 75cm into the ground Remove this pipe insert the...

Страница 9: ...xt segment segment 11 with it While holding segment 11 with one hand lower segment 12 back into 11 until only about 30 or 40 cm are sticking out Tape with electrical tape You will now slide the entire...

Страница 10: ...insert the belt between clamps 9 and 10 TIP Although you can tighten the clamps using a standard screw driver it is much easier and faster to use a 7mm nut driver or a ratchet with a 7mm socket DON T...

Страница 11: ...mounted AFTER the pole is fully erected and properly guyed Paragraph 3 5 page 25 Proceed as follows Fasten the pole to the wooden base stake pulling the top strap tight but leaving the bottom strap lo...

Страница 12: ...illimeter because they may also be adjusted in the field when tuning This will depend on the ground characteristics of your location The final field adjustment of the top hat wires is critical Even th...

Страница 13: ...s antenna As pointed out earlier for more information on the deployment of radials and their impact on performance we recommend reading the excellent article by Rudy Severns N6LF in the December 2010...

Страница 14: ...electrical tape or similar You may also use your XYL s nail polish for this If using nail polish apply 2 or 3 coats allowing to dry between coats This completes the preparation of the first 2 or 4 gr...

Страница 15: ...ough the hole in the end of an insulator exiting through the slot in the middle of the insulator Pull about 2 4m of wire through the hole and out the slot then fold it back about 2 4m such that the di...

Страница 16: ...e free hole of the top hat insulator pulling it out through the middle slot in the insulator Tie a large knot in the PVDF Monofil line about 10cm from this end Tie any kind of knot you like just make...

Страница 17: ...e preparation of all four top hats TIP Temporarily tie the far end of the Monofil line to a small weight We use heavy lead sinkers 140 gr 4 or 5 oz weights sourced from a fisherman s supply shop for t...

Страница 18: ...tape a large 8mm UV Resistant cable tie a soldering iron 60w or more and liquid electrical tape or similar to insulate the connection 3 1 1 Mounting the 4 Top Hat Wires and Vertical Radiator Wire to t...

Страница 19: ...f the excess leaving about 1cm of exposed soldered wire Finally insulate the remaining 1cm of exposed soldered wire with liquid electrical tape or with whatever your favorite similar insulating substa...

Страница 20: ...square knot such that their knots are 90 apart Later you will tie the four 2mm Kevlar guy ropes to the rope stubs using a sheet bend knot as described in paragraph 2 4 3 on page 10 3 1 4 Raising the p...

Страница 21: ...sure the guy belt or guy rope stubs are resting at the bottom of segment 9 directly on top of clamp 9 At this time pause stretch all 4 upper guy ropes fully out and also tie some sort of weight to the...

Страница 22: ...rom the stake Remove the tape which was temporarily holding the wire to segment 1 On the final segment segment 1 you will change the winding method winding about 10 to 12 turns per meter with windings...

Страница 23: ...you are not sure whether it is too windy or not then assume it is too windy and PLEASE follow these special instructions First of all if there is a storm with very high winds it is probably better to...

Страница 24: ...re very thin and very light The top hat lines are very light When pulling them tight and fastening to the ground stakes please take care not to pull the lines tight the first time you tie them Leave t...

Страница 25: ...ls every attempt should be made to keep the individual radials symmetrical and equally spaced The reality is in many installations this is not physically possible In that case just try to do the best...

Страница 26: ...you only need to remove 1 5 to 1 8cm per kHz EXAMPLE Say you want to raise SWRmin by 50 kHz Normally you would calc 2cm per kHz or 100cm 38 to be cut 50x2 100 for 50 kHz To be on the safe side at fir...

Страница 27: ...n Now divide the number of cm cut off by the number of KHz of increase in SWRmin The result will tell you how many cm per KHz must be removed at your specific QTH to adjust SWRmin upwards Adjust the l...

Страница 28: ...describe every scenario you might encounter in the field If you have run out of ideas please record everything which you have tried so far and contact Spiderbeam Tech Support as displayed below 5 0 AP...

Страница 29: ...Guy Belt Set for 18m HD Telescoping Pole 2 8 Galvanized steel ground peg 330mm long 3 8 Galvanized steel ground peg 750mm long 5 1 4 Recommended Tools Supplied by User Nr Qty DESCRIPTION 1 1 Solderin...

Страница 30: ...ound out the melted bulb of Polyester by slightly stretching it with your fingers o Tip if not wearing gloves it helps to lick your fingers before doing this helps prevent burning Trim off any long th...

Страница 31: ...information http www animatedknots com overhand 5 3 2 The Sheet Bend The Sheet Bend or Becket Bend joins two ropes that are of unequal size but also works well if the ropes are the same size Normally...

Страница 32: ...ertical Antenna it is used for fastening the short 6mm rope stubs to the pole see 3 1 4 2 Hint after tying the knot secure the tips of each short end of the rope to itself with a small wire tie placed...

Отзывы: