8. Install the pump head (13) (sometimes called pump casing).
A.
Prepare the pump head clamp (14).
• Apply food grade anti-seize to the threads on the hand nut / tee nut.
• The hinged receiver will swing over and capture the round perpendicular peg on the
threaded rod.
Figure 31
shows the pump head clamp mechanism.
• Adjust the tee nut so that the threaded rod protrudes as far as possible.
B.
Present the pump head (13) to the backplate (6) using a laser or bubble level on the
discharge port to ensure orientation is correct.
• Check that the gap between the pump head (13) and backplate (6) is even all the way
around the circumference. Visual inspection should show approximately a 1/64-1/32” gap
as shown in
Figure 32
.
FIG. 31 - PUMP HEAD CLAMP DETAIL
FIG. 32 - PUMP HEAD-TO-BACKPLATE GAP
\\ASSEMBLY INSTRUCTIONS -
\\
SP51/SP61/SP81
Содержание SP41
Страница 1: ...PUMPS SP41 SP51 SP61 SP81 INSTALLATION OPERATION MAINTENANCE...
Страница 32: ...32 PUMP CURVES SP41 SP41 Pump Curves...
Страница 33: ...33 PUMP CURVES SP51 SP51 Pump Curves...
Страница 34: ...34 PUMP CURVES SP61 SP61 Pump Curves...
Страница 35: ...35 PUMP CURVES SP81 SP81 Pump Curves...
Страница 36: ...36 PUMP CURVES SP81...
Страница 40: ...PUMP IOM REV 8 21...