Installing the clean room system
6.1
Installing the FMS series SuSi
The FMS series SuSi can be installed in the following locations:
■
On a machine
■
Above a table or workstation
■
On the ceiling of a building
FMS series SuSi installation from above
1
FMS series SuSi
2
Profile frame
3
M6 fillister head screws
1. Position the FMS series SuSi (1) flush on the profile frame (2). The internal dimensions of the profile frame
can be found in the technical data, see
Chapter 3.5, "Internal dimensions of the frame of the laminar flow
.
2. Screw the FMS series SuSi firmly to the profile frame using M6 fillister head screws (3).
3. Check that the FMS series SuSi is firmly positioned.
6.0 2020
29
Содержание FBS 112 standard
Страница 1: ...Laminar flow systems Translation of the original operating instructions 6 0 2020...
Страница 51: ......