background image

3.4 ENVIRONMENTAL CONDITIONS 

4.2 PREPARATION

On receiving the product: remove the packaging and display the material so that all is visible. 
The appliance must be checked before every use so as to reveal any working abnormalities and/or damage caused by transport and/or storage. 

4 OPERATING INSTRUCTIONS

4.1 TRANSPORT AND STORAGE

Before transporting the appliance, make sure that it is correctly packaged ensuring also that there are no risks of shocks or falls during the tran-
sport itself. Keep the original packaging for any eventual further transport. Damage to the appliance caused during transport and handling is not 
covered by the guarantee. Repairs or replacement of the damaged parts are the responsibility of the Client. The appliance must be stored in a 
dry place free from humidity.  
During stockage, make sure not to place any heavy materials on top of the Z4002; the device should not be considered a support, if not for the 
employment is has been designed for.

For both operation and stockage: from -20°C to +60°C

4.3 FUNCTIONING

Before every use, make sure to check the following points scrupulously:

General functionality of the device

Fixation of nuts and bolts

Use of wheels and breaks

Spring release

3.3 TECHNICAL DATA

Minimum heigth 
Maximum height
Intermediate height
Lenght
Width
Weight
Capacitiy

550mm
850mm
795mm
1350mm
620mm
25 +/- 3%
250Kg

Wheels  Ø200mm 

Frame Material
Supporting Frame

Finish

Polyamide core

Polyurethane foam wrap

Sphere bearing in Stainless Steel 
Stainless Steel AISI 304
tube Ø35x1,5mm Stainless A304
tube 25x15x1,5mm Stainless A304
Electro Shine Finish

4.3.1 Loading the coffin for working bench use of the device 
In this phase at least two physically suitable operators are needed

1. Insert the brakes of the wheels of the Z4002
2. The operator has the possibility to replace the anti-vibrating rubber supports with the nails (to be find under the tube) by simply (un)screwing both

accessories; both allow the levelling of the bench, assuring stability and safety 

3. Fold the roller supports in unloading position (inwards, in the direction of the space dedicated to the fork lift Fig. 2)
4. Load the coffin on top of the device, making sure to distribute the weight of the load in a balanced way

The central part of the device is dedicated to an easy positioning of the coffin by fork lift (Fig. 2). Two operators are needed anyway

4.3.2 Transport and unloading the coffin 

In this phase at least two physically suitable operators are needed

1. Unblock the brakes
2. Activate the rotating supports, making sure the rolling system supports the bottom of the coffin with a rotation in outside direction 
3. When close to the van, if previously inserted, unblock the rolling system with the apposite levers on both sides, in order to allow a natural rolling

of the coffin

4. Roll the coffin into the van, paying attention to its balance and the linear movement set up by the trolley's rolling system 

4.3.3 Height management 

In this phase no load may be placed on the device

4.3.3.1 In order to obtain an intermediate height, starting from the maximum height, turn the 4 upper knobs (Fig. 1 - n ° 5) in the direction indica-

ted by the arrows in order to unblock the system; move the upper structure downwards and block it with the same knobs, turning them in opposi-

te direction.

4.3.3.2 Obtaining the minimum height, starting from the maximum heigth:

1. Unblock the 4 upper knobs (Fig. 1 - n ° 5);

2. Remove the upper structure of the Z4002;

3. Unblock the 4 lower knobs of the extensions (Fig. 1 - n ° 4) by turning them in the direction indicated by the arrows;

4. Remove the 4 extensions; 

5. Insert the upper structure on the lower structure without the removed extensions;

6. Fix the 4 knobs in the apposite holes by turning them.

3

Fig.2

Fig.3

Содержание Z4002

Страница 1: ...acement parts pag 4 INDEX S P 0 6 1 3 0 I U Spencer Italia S r l Str Cavi 7 43044 Collecchio PR ITALY tel 39 0521 541111 fax 39 0521 541222 e mail info spencer it www spencer it Z4002 User s manual Guarantee of Quality system for the production and the final control of the products certified by the notifying body TUV Italy REV 0 23 01 07 ...

Страница 2: ...which they were inten ded or no longer supply the intended service must satisfy the valid conditions for the introduction onto the market Ensure that all the necessary precautions are taken in order to avoid hazards that can arise as the result of contact with blood or body fluids Handle with care 2 2 SPECIFIC WARNINGS The product may only be used by trained personnel Never exceed the maximum capa...

Страница 3: ...02 2 The operator has the possibility to replace the anti vibrating rubber supports with the nails to be find under the tube by simply un screwing both accessories both allow the levelling of the bench assuring stability and safety 3 Fold the roller supports in unloading position inwards in the direction of the space dedicated to the fork lift Fig 2 4 Load the coffin on top of the device making su...

Страница 4: ...time of 5 years 6 ACCESSORIES AND REPLACEMENT PARTS 6 1 ACCESSORIES No accessories available 6 2 SPARE PARTS Copyright Spencer Italia S r l All rights reserved No part of this document must be photocopied reproduced or translated into another language without the written approval of Spencer Italia S r l Warning The information container in this document can be modified without warning and is not t...

Отзывы: