Step 5

8-Ton Bottle Jack & Retaining Cup Installation

a)

Locate the 1/2” Jack

Pivot Shaft (Item #12),

and the two (2) 1/2”

Rue Clips (Item #6).

b)

Position the Bottle

Jack & Retaining Cup

Assembly from

Step #2

into the Tube Bender

Frame as

shown in

Figure 5.0

with the

Retaining Cup between

the two mounting ears

on the top side of the

Tube Bender Frame.

Note orientation of the

Bottle Jack with respect

to the Tube Bender.

c)

Apply a small amount of lightweight oil to the 1/2” Jack Pivot Shaft.

d)

Insert the Jack Pivot Shaft through one of the outside holes in the

Tube Bender Frame. Then through the first mounting ear and finally

through the Jack Ram Retaining Cup and last mounting ear.

e)

Insert the 1/2” Rue Clips into both ends of the Jack Pivot Shaft.

f)

Position the Bottle Jack onto the Jack Saddle Assembly as

shown

in Figure 5.0.

g.

Speedway Motors recommends match drilling a hole through the

Bottle Jack base into the Jack Saddle assembly. This will allow for

the installation of a 1/4” bolt and nut (not included) to secure the

Bottle Jack to the Jack Saddle(*).

NOTE:

Customer may use a small C-Clamp or Vice Grip to clamp

the Bottle Jack to the Jack Saddle Assembly. This is only required if it

is not possible to install the 1/4" bolt and nut after match drilling the

Bottle Jack and Jack Saddle Assembly as indicated in

5-g

.

Step 6

Spring & Safety Cable Installation

a)

Locate the Forming Die Return Spring (Item #13), the Spring Safety

Cable (Item #14), two (2) 1/4”-20 Hex Bolts, (Item #7) and the Jack

Pump Handle (Item #15).

b)

Feed the Spring Safety Cable through the Forming Die Return Spring

.

c)

Attach one end of the Forming Die Return Spring through the spring

mounting hole in the Jack Saddle Assembly as

shown in Figure 6.0.

d)

Pull the opposite end of the spring up and slide it over the Spring

Hook on the Tube Bender Frame as

shown in Figure 6.0.

(Be certain the Forming Die Return Spring is hooked into the groove

on the Spring Hook.)

e)

Fasten the upper end of the Spring Safety Cable to the threaded

hole on the Spring Hook using one (1) of the 1/4”-20 Hex Bolts.

Fasten the lower end of the Spring Safety Cable to the threaded

hole in the Tube Bender Frame with the remaining 1/4”-20 Hex Bolt

as

shown in Figure 6.0.

f)

Place the Jack Pump Handle into the Handle Retaining Rings on

the side of the Tube Bender Frame as shown.

Figure 6.0

Spring & Safety Cable Installation

Step 4

Follower Die Installation

a)

Locate the Follower Die (Item #17), the remaining 1” Die Pivot

Shaft (Item #11), and the remaining two (2) 1” Rue Clips (Item #7).

b)

Apply a small amount of lightweight oil to the Die Pivot Shaft.

c)

Insert the Follower Die inside of the Tube Bender Frame. Insert

the 1” Die Pivot Shaft through the appropriate (*) mounting hole in

the Tube Bender Frame, through the Follower Die, and through

the corresponding hole in the other side of the Tube Bender

Frame as

shown in Figure 4.0.

NOTE:

(*) Use the hole marked “A” for the 1.00” and the 1.25”

Follower Dies. Use the hole marked “B” for the 1.50”, 1.625” and

the 1.75” Follower Dies.

d)

Insert the Rue Clips into both ends of the Die Pivot Shaft.

Step 2

8-Ton Jack & Jack Ram Retainer Cup Assembly

a)

Locate the 8-Ton Bottle Jack (Item #1), the Jack Ram Retainer Cup

(Item #10), and the two (2) #10-32 Button Head Allen Screws (Item

#5).

b)

On the 8-Ton Bottle Jack, extend the Jack Ram up by screwing the

Jack Ram out. The Jack Ram should be approx. 11/16” to 3/4” above

the flat surface on top of the large hex of the Bottle Jack.

c)

Place the Jack Ram Retainer Cup on top of the Jack Ram and align

the hole in the Retainer Cup as

shown in Figure 2.0.

The bottom

surface of the Retainer Cup should just touch the flat surface on top

of the large hex of the Bottle Jack. If it does not touch, remove the

Retainer Cup and screw in the Jack Ram until the Retainer Cup

touches. This insures the Bottle Jack will achieve maximum stroke.

d.

Using the two (2) #10-32 Button Head Allen Screws, secure the

Retainer Cup to the Jack Ram. The screws may not completely

bottom out on the Retainer Cup, this is normal, as long as they are

secured tightly.

Step 3

Bending Die Assembly Installation

a)

Locate the Tube Bender Frame Assembly (Item #8), one of the 1”

Die Pivot Shafts (Item #11), and two (2) of the 1” Rue Clips (Item #7).

b)

Carefully locate the Bending Die Assembly/Jack Saddle Assembly

from

Step #1

into the Tube Bender Frame Assembly as

shown in

Figure 3.0.

c)

Apply a small amount of lightweight oil to the 1” Die Pivot Shaft.

d)

Align the pivot mounting hole of the Bending Die Assembly with the

mounting holes in the Tube Bender Frame. Insert the Die Pivot Shaft

into the mounting holes to fasten the Bending Die Assembly to the

Tube Bender Frame.

e)

Insert the Rue Clips into both ends of the Die Pivot Shaft.

Figure 3.0

Bending Die

Assembly

Installation

Figure 2.0

8-Ton

Jack & Jack

Retainer Cup

Assembly

Figure 4.0

Follower Die

Installation

Jack Handle

Tube

Figure 8.0

Rear View of Finished Tubing Bender Assembly

Figure 7.0

Front View of Finished Tube Bender Assembly

Figure 5.0

8-Ton Bottle

Jack &

Retaining Cup