background image

5

4

Spectrum

TM

4. Component Contents

4.1. SPECTRUM 5, 7 or 12 Valve

Please unpack your goods and ensure that all components are included. If something is missing, or damaged you 

should contact us immediately. If you are planning to store the components before installation, they should be secured 

in a dry area with no risk of freezing as it could affect sensitive components such as plastics becoming brittle or 

electronics potentially failing.

4.2. SPECTRUM Pressure Vessel & Riser Tube

4.3. SPECTRUM Brine Tank

4.4. SPECTRUM Softening Resin

Volume varies according to the model.

Dimension varies according to model, also includes 

brine tube and safety brine valve.

Содержание MixH2O-PRO

Страница 1: ...nts Features Functions p 4 4 Component Contents p 5 5 Valve User Interface p 6 6 Installation Instructions p 8 7 Valve Programming Set up p 10 8 Troubleshooting p 13 9 Cautions p 15 10 Technical Information p 16 Spectrum TM Installation Service Operation Manual MixH2 O PRO Water Softener ...

Страница 2: ... the model supplied as this will have an influence on various parameters for starting up your softener especially on the programming side Softeners once installed are low maintenance and only need salt in order to operate Please ensure that the brine tank has got a minimum level of salt at all times Water softeners will fall under laws and guidelines of the country where it is installed Please che...

Страница 3: ...reated Water Volume litres Resin Type Outlet Water Hardness tH Resin Volume litres Salt Quantity per Regeneration kg Volumetric m3 Down Flow Brining 1 Backwash min 2 Brining Rinse min 3 Rapid Rinse min 4 Brine Tank Refill min Low Voltage DC Transformer 2 Description Equipment Adjustments Please use this sheet to keep a record of your system parameters and installation ...

Страница 4: ...ove the residual regenerant salt after the brining step until the water from outlet contains no regenerant rinse could also compact the resin bed for a better softening effect Refill Refill the brine tank with water to dissolve salt for the next regeneration Valve Operation Mode Softener Standard water softener operation Regeneration Mode Volumetric immediate or delayed with electronic timer Water...

Страница 5: ...o store the components before installation they should be secured in a dry area with no risk of freezing as it could affect sensitive components such as plastics becoming brittle or electronics potentially failing 4 2 SPECTRUM Pressure Vessel Riser Tube 4 3 SPECTRUM Brine Tank 4 4 SPECTRUM Softening Resin Volume varies according to the model Dimension varies according to model also includes brine ...

Страница 6: ... Interface Brine Line Drain Line Blending Valve Inlet Outlet Regeneration Indicator Parameter Display Flow Rate Indicator Regeneration Button R Next Button Up Button Down Button Time Display Cycle Nº Bypass 5 1 SPECTRUM 5 Valve ...

Страница 7: ...7 6 Spectrum TM 5 Valve User Interface 5 2 SPECTRUM 7 12 Valve Up Button Cycle Nº Regeneration Indicator Down Button Next Button Time Display Flow Rate Indicator ...

Страница 8: ... the technical data chart at the end of the document The diameter of the flexible drain pipe should be able to accommodate the flow of water to the drain If the water does not flow to the drain properly this will affect the performance of your softener The drain should never be higher than the valve height as the back pressure will affect the flow of the drain Secondly you will need a connection g...

Страница 9: ...old soft water tap nearby and allow to run for a few minutes or until the system is free from foreign material that may have resulted from the installation 6 Once clean close the water tap Place the by pass in service position and let water flow into the pressure vessel When water flow stops slowly open a cold water tap nearby and allow to run until the air is purged from the unit 7 Plug the valve...

Страница 10: ...rmined number of days the override will trigger a regeneration Input the number of days to override regeneration 1 To enter Master Programming Mode set the time to 23 45 and press the next button for 8 seconds The recommended options for your system have been highlighted below in green The values to input based on your individual installation have been highlighted In yellow below 2 Navigate throug...

Страница 11: ...Regeneration time slot disabled 3rd regeneration time slot xx H3 Regeneration time oF H3 Regeneration time slot disabled 4th regeneration time slot xx H4 Regeneration time oF H4 Regeneration time slot disabled 7 Valve Programming Set Up Note Some items may not be shown depending on valve configuration The valve will discard any changes and exit Master Programming Mode if any button is not pressed ...

Страница 12: ...5 0 41 7 58 3 320 3 9 7 8 11 7 15 6 23 4 39 1 54 7 340 3 7 7 4 11 0 14 7 22 1 36 8 51 5 360 3 5 6 9 10 4 13 9 20 8 34 7 48 6 380 3 3 6 6 9 9 13 2 19 7 32 9 46 1 400 3 1 6 3 9 4 12 5 18 8 31 3 43 8 420 3 0 6 0 8 9 11 9 17 9 29 8 41 7 440 2 8 5 7 8 5 11 4 17 0 28 4 39 8 460 2 7 5 4 8 2 10 9 16 3 27 2 38 0 480 2 6 5 2 7 8 10 4 15 6 26 0 36 5 500 2 5 5 0 7 5 10 0 15 0 25 0 35 0 7 2 Capacity Calculatio...

Страница 13: ...tion 3 Re regeneration or use new resin G Softener fails to use salt 1 Water pressure is too low 2 Brine line blocked 3 Injector is blocked 4 Internal control leak 1 Line pressure must be at least 20 psi 2 Clean brine line 3 Clean or replace injector screen 4 Check piston seals and spacers H Brine container overflow 1 Refill time too long 1 Contact your supplier for assistance I Water hardness rem...

Страница 14: ...the water supply 2 Iron build up in the system 3 Levels of iron too high in the feed water 1 Clean or replace the supply line to the system 2 Clean the valve and the resin bed 3 Increase backwash time to prevent fouling Specifically install an addi tional filter to remove iron D High levels of brine present in the brine tank 1 Clogged drain line 2 Defective cycle time 1 Check and clean the drain l...

Страница 15: ...less than 3 metres It is recommended to install a check valve between the filter and the boiler if unable to meet the required piping length 8 The input water pressure must be between 2 8 bar 9 No chemicals should be present at the inlet and outlet connecting sectors 10 Besides the system spare part connection materials are not included in the scope of the manufacturer s warranty 11 The required e...

Страница 16: ...P BSP 1 BSP Brine Line push fit push fit push fit push fit push fit push fit push fit Power Requirements V 240V or 3V Battery 240V or 3V Battery 240V or 3V Battery 240V 240V 240V 240V Resin Volume l 25 50 75 100 150 250 350 Salt Consumption Per Regeneration kg 3 6 9 12 18 30 42 Pressure Tank Thread 2 2 2 2 2 4 4 Vessel Size 09x35 10x54 13x54 14x65 16x65 21x62 24x72 Brine Tank Volume l 70 100 140 1...

Страница 17: ...16 Spectrum TM WWW SPECTRUM FILTRATION COM ...

Отзывы: