Spectrum 68 Series Скачать руководство пользователя страница 6

End-Support Leg Assembly

1.  Attach the side panel to the leg frame as shown with (6) 8-32 x 1/2” PH thread-cutting screws and tighten securely.  

Figure 4A

Note: The 4” grommets will be at the rear of the console.

2.  Install the (2) glides onto the bottom of the leg.  (The glides can be adjusted later to level the console if necessary.)

3. 

Align the assembled end-support leg and wall filler panel mounting holes.  

Figure 4B

.

Be sure the wall filler panel overlaps the end-support leg as shown

.

4.  Attach with (4) 1/4-20 x 15mm JC bolts.

5.  Worksurface attaches to the end-support leg with (2) 1/4-20 x 40mm JC bolts.

Equipment Rack-to-Equipment Rack Connection

1.  Place the two equipment racks together as shown.  

Figure 5

.

2. 

Install (2) 1/4-20 x 90mm JC bolts and (2) 1/4-20 flanged locknuts.

3.  Do not over-tighten fasteners.

0108630R11 Page 6 of 10

Figure 5

1/4-20 x 90mm 

JC bolt

1/4-20 x 90mm JC bolt

1/4-20 flanged locknut

1/4-20 flanged locknut

Figure 4A

Note:

 End-support legs are used only 

at the end of a worksurface (not on a 

seam between two worksurfaces).

Figure 4B

1/4-20 x 15mm 

JC bolt 

(4 required per 

connection)

Wall filler 

panel

Flush side of panel in end-

support leg facing outward. 4” 

grommets toward rear of console.

Open area under 

worksurface

Assembled end-

support leg

Glide

8-32 x 1/2” PH 

thread-cutting screw

(6 required)

Glide

Be sure the wall filler 

panel overlaps the 

end-support leg here.

Leg frame

4” Grommet

Side panel setup for 

right-side installation 

on console (this side 

faces 

inside 

console, 

4” 

grommets toward rear)

Содержание 68 Series

Страница 1: ... within 5 days of receipt To report information regarding missing parts or damage to purchase parts or acces sories or if you have any questions please contact us www spectrumfurniture com 800 235 1262 715 723 6750 Thank you for purchasing Spectrum products Instructor Media Console 68XXX series Note The items below represent all the structural components available for the Instructor Media Console ...

Страница 2: ... 037779 2 1 4 20 x 40mm JC bolt 021581 6 8 32 x 1 2 PH thread cutting 0100167 2 4 Snap in grommet 0104836 1 4mm Hex wrench 025039 1 Glide wrench 025069 68105 29 End Support Leg 68151 36 Wall Filler Panel 10 1 4 20 x 15mm JC bolt 052605 4 1 4 20 Flanged locknut 0108896 1 4mm Hex wrench 025039 2 Cord clip 044207 68101 29 Wall Filler Panel 68154 36 Mid Support Leg 4 1 4 20 x 15mm JC bolt 052605 2 5 1...

Страница 3: ...rface is specified at least one equipment rack should be used underneath to provide adequate support Mid support legs are used at the seam two worksurfaces End support legs are used at the end of a worksurface For adequate support areas under worksurfaces generally should not exceed a span of more than 2 open spaces or wall filler panels wide Double worksurface Triple worksurface Radius corner wor...

Страница 4: ...ce to the wall filler panels with 4 1 4 20 x 15mm JC bolts Figure 1B Figure 1B Assembly Setup Figure 1A 0108630R11 Page 4 of 10 Wall filler panel Wall filler panel Corner panel Glides 1 4 20 x 15mm JC bolts Corner worksurface 3 8 monitor arm mounting hole 3 8 monitor arm mounting hole Note Monitor arms can be mounted to the corner worksurface using the left or right 3 8 mounting holes Note Do not ...

Страница 5: ...JC bolts Locknuts not required Wall Filler Panel Assembly Panel to Panel Attachment 1 To attach two wall filler panels together align the mounting holes 2 Attach together with 4 1 4 20 x 15mm JC bolts and 4 1 4 20 flanged locknuts Figure 3B 0108630R11 Page 5 of 10 Figure 2A Figure 2B Glide Adhesive bumper Rear door Adhesive bumper Figure 3A Figure 3B Equipment rack Wall filler panel 1 4 20 x 15mm ...

Страница 6: ...wo equipment racks together as shown Figure 5 2 Install 2 1 4 20 x 90mm JC bolts and 2 1 4 20 flanged locknuts 3 Do not over tighten fasteners 0108630R11 Page 6 of 10 Figure 5 1 4 20 x 90mm JC bolt 1 4 20 x 90mm JC bolt 1 4 20 flanged locknut 1 4 20 flanged locknut Figure 4A Note End support legs are used only at the end of a worksurface not on a seam between two worksurfaces Figure 4B 1 4 20 x 15...

Страница 7: ...led wall filler panels 3 Align the worksurface mounting holes with the wall filler panel mounting holes 4 Attach with 1 4 20 x 15mm JC bolts Worksurface Assembly Note Mid support legs are used at the joint connec tion of two worksurfaces to provide support for two or more open spaces or wall filler panels wide Note This is the connection between two worksurfac es with open area underneath no equip...

Страница 8: ...urfaces and tighten all screws securely Cord Clips 1 Apply cord clips to underside of worksurface where needed to route and secure cords Figure 8 Clips only included with radius corner and wall filler panels Worksurface to Worksurface with Equipment Rack Figure 7C Note This is the connection between a worksurface of equal height to another worksurface above an equipment rack Note This is the attac...

Страница 9: ...he left or right side Weight capacity 35 lb 15 9 kg Dimensions 21 1875 W 53 8 cm x 30 D 76 2 cm x 1 H 2 54 cm Unit weight N A Flip up Shelf 68204 Shelf hinges lock into place in the upright position Shelf mounts level with worksurface Includes 2 grommet Mounting plate available in black or dark gray Equipment Rack Bottom Shelf 68203 Increases security Prevents static electricity and dust build up ...

Страница 10: ...ODUCT AT ISSUE AND RECALLACTION EXPENSES SPECTRUM SHALL NOT BE SUBJECT TO ANY OTHER OBLIGATIONS OR LIABILITIES WHETHER ARIS ING OUT OF BREACH OF CONTRACT WARRANTY TORT INCLUDING NEGLIGENCE AND STRICT LIABILITY OR OTHER THEORIES OF LAW WITH RESPECT TO PRODUCTS SOLD OR SERVICES RENDERED BY SPECTRUM OR ANY UNDERTAKINGS ACTS OR OMISSIONS RELATING THERETO Our Customer Service Department is ready to pro...

Отзывы: