Note: Power and communication wiring for document cameras, laptop
computers, and / or projectors placed on the flip-up shelf should be
routed on top of the audience-side of the shelf. Use of the shelf grommet
hole for wiring will result in pinching of the cords when the shelf is folded.
For stability reasons, Spectrum does not recommend attaching
the shelf to a stand-alone equipment rack.
Folding shelf
bracket
Release lever
(press here)
0118408R12 Page 7 of 20
Note: The flip-up shelf option may not be included with
all configurations. The shelf is designed for use on
Freedom One eLift equipment racks that are attached to
the lectern with unit-to-unit connectors. It is not recom-
mended for use on stand-alone equipment racks.
The shelf is to be installed on the equipment rack side
opposite the Freedom One Lectern.
Installing flip-up shelf
(select units)
1. Determine which side of the equipment rack the shelf is to be installed.
2. Extend and lock the folding shelf brackets into the horizontal position.
Figure 4A
.
3. Align and attach each bracket to the side of the lectern with (2) 8-32 x 3/8” PHM
screws and tighten securely.
Figure 4B
.
CAUTION
Keep clear of pinch points during shelf
movement. Do not exceed 35 lb [15.9 kg]
of weight on shelf.
Figure 4A
Operation
The shelf will automatically lock into place when lifted into the horizontal
position with the levers released.
Figure 4A
. To lower or flip-up the
shelf, press and hold the levers under each folding shelf bracket at the
same time while slowly lowering or raising the shelf. Do not exceed a
maximum of 35 lb of weight on the shelf. Do not move the unit while the
shelf is in the horizontal position.
Figure 4B
Folding shelf
brackets
8-32 x 1/2” PH
thread-cutting screw
(2 required per bracket)
Equipment