![Spectrum Industries 55218BW Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/spectrum-industries/55218bw/55218bw_owners-manual_1344901002.webp)
058719R8 Page 2 of 10
Handle Assembly
1. Attach the handle gusset and handle mounts to the bottom of the handle using 1/4-
20 x 15mm JC Bolts as shown in
Figure 1
. Do not tighten bolts completely yet.
(1) 052577B
Handle Gusset
Safety
Hardware Package Contents
Assembly / Setup
Note:
Handle is not included with the toe kick version.
Skip to step 3 if you have a CPL with a toe kick.
Figure 2
• Read this owner’s manual before assembly or operation.
• Do not allow children to move lectern.
• Move slowly and carefully when mobile.
• For indoor use only. Do not install or store the unit where it will be exposed to weather. Keep unit dry.
• For added safety, plug the unit into a grounded three-prong receptacle controlled by a GFI
(Ground Fault Interrupter) circuit breaker.
Tools Required
7/16” or adjustable wrench
4mm hex wrench
(included)
(10) 052605
1/4-20 x 15mm JC bolts
(10) 052605
1/4-20 x 15mm JC bolts
(2) 055001
Handle mount
(1) 025039
4mm hex wrench
(8) 035252
3/16” x 1/2” pine tree button
handle mount
handle gusset
handle mount
handle
Note:
It is critical that all joint connectors are used in
the attachment of the handle.
Figure 1
Handle Installation
1.
Determine which side of the lectern you would like the handle to be mounted, and open both doors.
2. Attach the handle assembly to the side of the lectern with (4) 1/4-20 x 15mm JC bolts. As shown in
Figure 2
.
3. Tighten all bolts securely.
1/4-20 x 15mm
JC bolt
1/4-20 x 15mm
JC bolt
1/4-20 x 15mm
JC bolt
1/4-20 x 15mm
JC bolt
1/4-20 x 15mm
JC bolt