Spectron Gas Control Systems GmbH
Dismantling and disposal | 8
GES_E71-VCR_0222
19
8.3 Disposal
Dismantling and disposal must be carried out in accordance with the official and legal require-
ments at the site of the system. The operator must produce a risk assessment and work instruc-
tions before dismantling. A piece of equipment may only be disposed of when the decontamina-
tion declaration has been provided, completed in full.