Spectron Gas Control Systems GmbH
Installation | 5
G56-SP_0520
15
Step 3.
Now press the fitting plate against the basic profile
and carefully slide it into the
lower
groove
Step 4.
Secure the fitting plate in position by tightening the
grub screw.
Step 5.
Insert the plastic side sections into the basic profile.
Step 6.
Now attach the cylinder bracket to the wall at approx-
imately 2/3 of the cylinder height and in centred posi-
tion beneath the process gas valves.
Step 7.
Where toxic or combustible gases are used, it must
be ensured that purge and venting gases are routed
off safely.
For example, the corresponding lines can be connec-
ted to the waste gas valve of the pressure control
panel and the relief valve of the pressure regulator via
compression fittings.
The following applies to the Spectron compression fit-
tings provided:
Insert pipes up to the end stop into the threaded fit-
tings and tighten union nut by 1 ¼ turns.