
32
C
HAPTER
3
Preparing for Installation
The
library
will
be
installed
by
a
certified
Spectra
Logic
field
engineer.
This
chapter
outlines
the
requirements
for
storing
and
moving
the
library
and
its
components.
Make
sure
that
you
review
these
requirements
carefully.
The
information
is
provided
to
ensure
that
the
installation
site
meets
the
necessary
requirements
before
the
Spectra
Logic
field
representative
arrives.
Topic
WARNING
Library frames are very heavy (see product specifications for details). Use extreme
caution and proper equipment when moving these, and ensure that your floor has
adequate structural integrity.
WARNING
Boxed and unboxed library components weigh from 200 to 400 pounds each (91 to
181 kg) or more. Use extreme caution and proper equipment when moving these.
WARNING
The ties around the shipping crates are secured very tightly; the tension may cause
them to whip outward when cut. Use care when cutting the ties so that you will not
be hit.