●
Overview
Junction box cotton pad
M20 Plastic Screw
Junction box
Water-proof
rubber ring
Junction box upper cover
KM4*10 threaded
screws
●
Installation
(
1
)
(
2
)
(
3
)
(
4
)
(
5
)
(
6
)
1
.
Drill installation holes according to drawing paper
,
then stuff into rubber stoppers
。
2
.
Paste cotton pad onto the bottom of junction
box
,
then push the water-proof rubber ring onto the
upper body of junction box
。
3
.
Use 3pcs PWA4*25 self-tapping screws to fix
junction box body
。
4
.
Use 3pcs KM4*10 threaded screws to fix
the upper cover with the junction box body
。
5
.
Disassemble the dome base
,
put the
cotton pad onto the upper cover
,
then use
4pcs PM4*12 screws to fix the dome base
with the junction box
。
6
.
Connect all cables and
put them into the junction
box
,
then install the
dome with the dome base
well
,
then use the dome
ring to fix
。
Содержание VLDT4W
Страница 2: ... video signal output switches ...