![Speck pumpen BADU BNR 400 Скачать руководство пользователя страница 60](http://html.mh-extra.com/html/speck-pumpen/badu-bnr-400/badu-bnr-400_operation-manual_1341776060.webp)
Commissioning/Decommissioning
26 EN
01|2020
6 Commissioning/Decommissioning
6.1 Commissioning
NOTICE
Make sure that the pool does not overflow and cause property
damage.
Check that there is a drain.
Check whether a safety time is set.
6.2 Functional
test
6.2.1 Function
start
The BADU BNR 400 starts with the program. The LED indicates
certain operating states. See point 3.1.5 on page 11.
The status screen is shown in the display when starting.
6.2.2 Shut-off
fittings
The correct operation of the refilling device must be checked
separately. A solenoid valve or fast ball valve is usually used for
this.
Содержание BADU BNR 400
Страница 3: ...DE DE DE Originalbetriebsanleitung BADU BNR 400 ...
Страница 34: ......
Страница 35: ...EN EN EN Translation of original operation manual BADU BNR 400 ...
Страница 66: ......
Страница 67: ...FR FR FR Traduction des instructions d utilisation originale BADU BNR 400 ...
Страница 100: ......
Страница 101: ...NL NL NL Vertaling van de oorspronkelijke gebruikershandleiding BADU BNR 400 ...
Страница 132: ......
Страница 133: ...IT IT IT Traduzione del manuale d istruzioni originali BADU BNR 400 ...
Страница 164: ......
Страница 165: ...ES ES ES Traducción de las instrucciones originales para el manejo BADU BNR 400 ...
Страница 197: ......
Страница 198: ......