![Spearhead SNIPER 600 SHD Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/spearhead/sniper-600-shd/sniper-600-shd_handbook_1341427029.webp)
8999128: v1 03/09/2018
Page 6.1 of 6.4 pages
Original instructions (ENGLISH)
Website: www.spearheadmachinery.com
6
Machine Adjustments
Below are the optimum torque settings to be applied when tightening the main screws and nuts.
Bolt Size
Torque (Nm)
M12
92
M14
145
M16
229
M18
314
M20
447
M22
604
6.1
Adjusting ground speed
Adjust work speed based on the amount of material to be shredded as well as how finely it is to be chopped up. As a
general rule, drive the tractor no faster than 8 km/h.
6.2
Adjusting cutting height
To adjust the cutting height of the tools, you need to adjust the position of the skids and rear rollers or wheels (optional
extra).
WARNING!
You need to position the tractor on a stretch of flat ground, with the engine switched off, the
parking brake on, the PTO disengaged and the key removed from the ignition and kept in a safe place.
Adjust the height of the rear rollers and side skids so that the PTO is parallel to the ground when the machine is
positioned parallel to the ground. Flails must work at least 20 or 30 mm off the ground. The side skids actually have to
be at least 20 mm lower than the skids working range. As a general rule, the skids must always be set to a height
where they will not come into contact with the ground.
6.2.1
Adjusting skid height
Please see Figure 6.1 for reference to the below procedure.
6.2.1.1. Loosen the screw (1);
6.2.1.2. Unscrew and remove the two nuts (2 and 3) and their respective screws;
6.2.1.3. Rotate the skid (4) so that it can be fastened on the other two holes;
6.2.1.4. Insert the two screws and lock them with the two nuts (2 and 3);
6.2.1.5. Tighten the screw (1);
6.2.1.6. Repeat the full procedure described above on the other side of the machine.
Figure 6.1