Spartherm Nova F Скачать руководство пользователя страница 11

GB

GB

 11

2.6 COMBUSTION CHAMBER LINING

Installation of the combustion chamber lining:

The individual chamotte bricks of the 
 

combustion chamber lining must be 
i nstalled as numbered, starting with num-
ber (1). The rear baffle plate (10) must be 
introduced diagonally into the combustion 
chamber until it is above the side walls. 
Then the baffle plate must be rotated 
horizontally in the free space above the side 
bricks and placed in the centre on the side 
bricks. In this regard, it is important that the 
top side of the deflector plate must be the 
rough top side. The front baffle plate (10) 
must be inserted in the same manner.

The combustion chamber lining is removed in the reverse sequence.
Important: When removing and installing, 
you must ensure that the chamotte does 
not hit against edges, fall over, etc. The 
 service life of the elements of the com-
bustion chamber lining is reduced through 
 mechanical  damage.

If replacement chamotte bricks are required, 
they can be requested through the stove fit-
ter with the appropriate order numbers.

Item no. and installation no.

SAP no.

Quantity

1

10 14 670

1

2

10 14 678

1

3

10 14 679

1

4

10 14 680

1

5

10 14 675

1

6

10 14 677

1

7

10 14 674

1

8

10 14 676

1

9

10 14 671

1

10

10 14 673

2

11

10 14 672 (for door height 510)
10 14 684 (for door height 570)

1

Содержание Nova F

Страница 1: ...GB Installation and Operating Manual Nova F...

Страница 2: ...ustomers emotions and speak to feelings such as security and comfort In order to be successful we recommend that you read these installation instructions care fully in order to quickly become thorough...

Страница 3: ...llation of S Thermatik motor air box 9 2 5 Changing the door stop 9 2 6 Combustion chamber lining 11 3 Initial commissioning 12 4 Operation 12 6 Fuel 13 7 Rating plate 13 8 General warranty terms and...

Страница 4: ...cified in this manual see technical data OUR HEATING INSERT HAS BEEN TESTED IN ACCORDANCE WITH DIN EN 13229 AND SATISFIES THE REQUIREMENTS STIPULATED IN THE CONSTRUCTION PRODUCTS DIRECTIVE DECLARATION...

Страница 5: ...ear mm 100 Ceiling mm 160 Setup floor only under the metallic coasting temperature box mm 20 Necessary minimum distances to heating chamber components Convection chamber side rear to insert mm 100 Ins...

Страница 6: ...GB 6 Fig 1b Nova F with front panel and external firing unit Fig 1a Nova F with wall penetrating element wall penetrating element wall penetrating element...

Страница 7: ...the respective German Federal State 1 BlmschV First Ordinance on the Implementation of the Federal Immission Control Act EnEV Energy Savings Ordinance TR OL Regulations of the German Tiled Stove and A...

Страница 8: ...ivery it may be necessary to mount the rotating disc through the combustion chamber in the floor area of the tiled stove e g device design with S Thermatik Installation is not executed in the factory...

Страница 9: ...o produce the air connection the four hexagon socket screws must now be unscrewed Then the connecting lever must be lifted off the air adjustment lever With this step the entire air control unit is fr...

Страница 10: ...opposite side where a bore is provided 3 Insertion of the new door Insert the new door to do this slide the door with the upper pivot hinge into the provided bores Then open the door 90 and fit the l...

Страница 11: ...rough top side The front baffle plate 10 must be inserted in the same manner The combustion chamber lining is removed in the reverse sequence Important When removing and installing you must ensure th...

Страница 12: ...e confirming proper installation and proper adjustment function of all control components and safety components must be given to the owner operator of the system Moreover the operator must be instruct...

Страница 13: ...t make wood During the lifetime of the tree sunlight is chemi cally captured Solar energy is stored in lignin and cellulose When the wood is burned that energy is released again For further informatio...

Страница 14: ...ty on elevating mechanisms operating devices such as handles adjustment levers shock absorbers electronic and electrical components such as exhausters gover nors original spare parts all purchased par...

Страница 15: ...s the right either to rectify the defect or to replace the unit free of charge Remediation of defects shall take precedence This warranty undertaking expressly does not cover further compensation exce...

Страница 16: ...for leaks yes no All safety devices thermal discharge safety device safety valve membrane expansion vessel checked yes no yes no Enter temperatures between insert and return flow boost Return flow te...

Страница 17: ...GB GB GB 17 NOTES...

Страница 18: ...GB 18 NOTES...

Страница 19: ...GB GB GB 19...

Страница 20: ...ndial para su sal n Het merk van wereldformaat voor uw woonkamer wiatowa marka do Pa stwa salonu 1 D Ihr Fachh ndler UK Your specialist dealer F Votre revendeur sp cialis IT Il vostro rivenditore spec...

Отзывы: