1
2
3
© Copyright 2019 SP01 Design.
All rights reserved.
S P Ø 1 D E S I G N . C O M
p. 4
MARBLE TOP ASSEMBLY
REMOVE THE METAL STRUCTURE FROM ITS PACKAGING AND PLACE IT ON THE FLOOR.
REMOVE THE MARBLE TOP FROM ITS PACKAGING AND PLACE IT ONTO THE THREE FIXING POINTS
OF THE STRUCTURE.
USE THE PROVIDED HARDWARE TO FIX ONE SCREW AFTER THE OTHER, TAKING CARE TO NOT TIGHTEN
THE SCREWS TOO MUCH. WE SUGGEST TO BEGIN FIXING THE POINTS CONNECTED TO THE ROUND
STRUCTURE FIRST (1&2), AND FINALLY FIX THE FREE STANDING LEG (3). YOU MIGHT NEED TO MOVE THE
METAL PART SLIGHTLY IN ORDER TO BE ABLE TO INSERT THE LAST SCREW.
MOHANA