Southwire Sumner Cricket Скачать руководство пользователя страница 3

LOADING A PIPE 

Fig. 1 

Fig. 2 

Fig. 3 

Fig. 4 

Fig. 5 

Fig. 6 

Fig. 7 

Fig. 8 

Remove handle. 

Place strap under pipe by rolling pipe. 

Put Cricket on top of pipe and ratchet strap tightly 

Put handle through tube sleeve on underside of 

Cricket. 

Put handle in upright position. Using leverage, lift cart up and walk over pipe. 

Continue to pull handle to flip Cricket onto its wheels. 

Rotate handle 180° as cart repositions. 

Replace handle to the original position and secure 

with plunger pin. 

Отзывы: