LOADING A PIPE
Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Remove handle.
Place strap under pipe by rolling pipe.
Put Cricket on top of pipe and ratchet strap tightly
Put handle through tube sleeve on underside of
Cricket.
Put handle in upright position. Using leverage, lift cart up and walk over pipe.
Continue to pull handle to flip Cricket onto its wheels.
Rotate handle 180° as cart repositions.
Replace handle to the original position and secure
with plunger pin.
Содержание Sumner Cricket
Страница 4: ......