9

 

Step 5:  Guy Wire Anchor Installation 

 

There are four types of anchors that are most commonly used with our towers; screw in “Auger” 
type anchors, hammer driven “duckbill” anchors, cast concrete anchors and expansion bolts (for use 
only in solid rock).  

What anchor should be used depends on the soil type that the anchors will 

be placed in.

  See the following table for our suggestions: 

 

Soil Type 

  Sand 
  Loose Gravel 
  Loam 
  Clay 
  Rocky Soil 
  Gravely Soil 
  Solid (Soft) Rock 
  Solid (Hard) Rock 

Recommended Anchor 

 Concrete 
 Concrete 
 Auger 
 Duckbill 
 Duckbill 
 Auger or Duckbill 
 Large, Long Expansion Bolt 
 Smaller Expansion Bolt 

Alternatives 

 None 
 None 
 Duckbill, Concrete 
 Auger, Concrete 
 Concrete 
 Concrete 
 Large Eye Bolt + Cement 
 None 

 
The loads on a single anchor can exceed 1,500 lb. in a 100-mph gale.  Make sure that the anchors 
chosen can withstand at least this much force or the tower will have to be lowered during storms.  
Augers and Duckbill anchors are frequently available at mobile home supply stores.  Augers are 
also available the dealer where your turbine was purchased or from SWWP.  Expansion bolts for 
anchoring in solid rock can be purchased at most hardware stores.   

 
Augers:

 If the soil conditions make their use feasible, augers are the simplest anchors to install.  

Augers screw into the ground using either a piece of wood, pipe or rod as a “cheater bar”.  If a 
mistake is made or if the tower must be removed an auger can be “unscrewed” out of the ground 
and reused.  They depend on the soil holding together for their strength are not suitable for sand or 
loose gravel.  If the soil is rocky or clay-like you may have difficulty screwing them in.   
 

 

An auger is usually installed by screwing it straight into the ground a few turns to get it started and 
then tilting it to the desired angle once it is into the ground a few inches.  A substantial downward 
pressure is usually necessary to get an auger started.  Screw the augers in as far as possible for the 
greatest strength.  
 

Содержание Whisper 200

Страница 1: ...0026 REV E SOUTHWEST WINDPOWER 5 20 05 1 24 FOOT 7 5 m LAND TOWER KIT For WHISPER 100 AND WHISPER 200 WIND TURBINES Made in the USA by Southwest Windpower 1801 W Route 66 Flagstaff AZ 86001 928 779 9...

Страница 2: ...r or your dealer for more information Notice This information is believed to be accurate however Southwest Windpower assumes no responsibility for inaccuracies or omissions The user of this informatio...

Страница 3: ...tower The guy wire attachment clamps onto the upper mast section This reduces the number of pieces of tubing used to construct the tower and reduces the stresses concentrated at this point Pre cut an...

Страница 4: ...ity Tower Base 1 Guy Wire set 1 3 8 x 2 Bolts 2 3 8 x 3 Bolts 2 3 8 Lock nuts 12 Cable Thimbles 4 Cable Clamps 12 Pivot Bolt and Nut 1 Tower Insert included with turbine 1 Tower Base Coupler 1 3 8 Car...

Страница 5: ...wind is a cube function of the wind speed This means basically that an increase in wind speed of 10 say from 9 mph to 10 mph will result in approximately a 37 increase in the power available from the...

Страница 6: ...iameter pipe This is the same outside diameter as 2 in steel water pipe where the 2 is a nominal size indicating an outside diameter that is actually 2 875 in Whether the pipe is schedule 20 or schedu...

Страница 7: ...already be part way up as it is erected In this case the two side anchors should be at the same height or elevation on the hill as the tower base The two remaining anchors should be directly uphill a...

Страница 8: ...nt and install its nut finger tight The two uprights should be assembled 4 apart The tower base coupler can be used to help set this distance 3 Bolt the two uprights to the two base plates using the c...

Страница 9: ...t this much force or the tower will have to be lowered during storms Augers and Duckbill anchors are frequently available at mobile home supply stores Augers are also available the dealer where your t...

Страница 10: ...and holds it straight while it is being driven into the ground Once the anchor is sufficiently deep in the ground the driver is withdrawn and the anchor cable is pulled a short distance to set the an...

Страница 11: ...lid rock expansion bolts in the rock may be the best means of anchoring your guy wires and base tube A hole is drilled into the rock and the bolt is placed in the hole with an attachment hanger a piec...

Страница 12: ...Turbine The tower is assembled laying on the ground and then lifted onto a sawhorse or large box so that the turbine can be mounted to it 1 Remove pivot bolt from tower base and insert it through the...

Страница 13: ...will help to have someone pull the slack out of the turbine electrical wires as the turbine is being moved into position 10 Make sure the bottom of the tower insert is touching the top end of the tow...

Страница 14: ...way or the other Make sure that none of the guy wires are crossed and that the side wires are straight with no rear wires on top of them Run the tail of each guy wire through the second clamp twice fo...

Страница 15: ...the tower while it is being raised 4 Move the vehicle forward slowly to take the slack out of the lifting wire Slowly proceed until the tower lifts off of the sawhorse Pull and stop every 15 degrees...

Страница 16: ...to lifting side anchor as described in step 7 attaching cables to anchors Maintain some tension on the lifting wire while the cable is being attached to prevent tower from falling back down 8 At this...

Страница 17: ...to loosen one wire and tighten the wire opposite to it Check the tower straightness and repeat the process until the tower is straight When you are finished make sure that all the cable clamps are ti...

Страница 18: ...se where the tower is expected to come to the ground to protect the turbine blades from damage 5 Tip the tower by hand until the lifting wire is taut and supporting the tower 6 Position a ladder under...

Отзывы: