background image

 

 

Page 6 of 17 

Receiving, Handling & Storage 

 

 

 

Receiving, Handling & Storage 

Receiving & Unpacking 

Unpack the equipment and check for damages or shortages immediately. The bill-of-

material from the Unit Assembly (switch) and Operating Mechanism drawings should be 

used for this purpose and can be found in the carboard tube housing inside the op mech 

container. If damage or a shortage is noted, file a claim immediately with the carrier and 

contact the factory. 

Storage 

All components of the SSB-T / SSB-A single side break disconnect switch are suitable 

for outdoor use and do not have any special storage requirements. If a motor operator is 

furnished be sure to connect the heater circuit, using the provided external wiring, while 

the unit is in storage. Discard the wiring upon installation. 
Typical crating is intended for storage less than 1 year. If long term storage is required 

please notify factory at time of order placement so that special crating can be used. 

 

 

 

 

Содержание SSB-A

Страница 1: ...Types SSB T SSB A copper aluminum Single Side Break Disconnect Switch 15 5 kV 72 kV 1200 A or 2000 A INSTRUCTION INSTALLATION MANUAL...

Страница 2: ...Page I The Quality Name in High Voltage Switching...

Страница 3: ...sons present to develop and implement a proper rigging lifting and installation plan along with all safety precautions required to insure safe and proper lifting and installation of the equipment to d...

Страница 4: ...and inspected as provided by this instruction manual and in compliance with best industry practices but in no event will the Equipment be inspected and tested less frequently than once in every 6 mon...

Страница 5: ...his manner will constitute the Warranty Holder s exclusive remedy and fulfillment of all SSLLC s liabilities and responsibilities hereunder SSLLC s duty to perform under this limited warranty may be d...

Страница 6: ...Page V The Quality Name in High Voltage Switching...

Страница 7: ...Page VI The Quality Name in High Voltage Switching Type SSB T SSB A Single Side Break Disconnect Switch 15 5 kV 72 5 kV 1200A or 2000A...

Страница 8: ...justment 9 Adjustment of switch in closed position 9 Adjustment of switch in open position 9 Adjustment of contact pressure 10 Arcing Horn Adjustment 11 Check Single Pole Adjustments 11 Operating Mech...

Страница 9: ...nect Switch Common Terminology 4 Figure 2 Hinge End 7 Figure 3 Contact End Switch Open 7 Figure 4 Blade Shown Fully Open 9 Figure 5 Rotating Insulator Bearing 9 Figure 6 Contact End Shown Fully Closed...

Страница 10: ...atter shall take precedence Summary These instructions do not purport to cover all details or variations in equipment or provide for every possible contingency to be met in connection with installatio...

Страница 11: ...ditions associated with a specific application are not sufficiently addressed All photographs and sketches in this manual are for illustration purposes only and may not be to scale Refer to the Unit A...

Страница 12: ...Page 3 of 17 Summary Introduction...

Страница 13: ...ssemblies Live Parts blades with hinges terminal pads and contacts Bases Insulators Interphase Control Pipes with Hardware Outboard Bearing Operator A Terminal Pad B Contact C Contact Adjusting Bolt C...

Страница 14: ...Peak Withstand 99 kA Ambient Temperature Rating 40OC to 50OC Standard 50OC Optional Ratings 2000 A Maximum Voltage Rating 15 5 kV 27 kV 38 kV 48 3 kV 72 5 kV BIL 110 kV 150 kV 200 kV 250 kV 350 kV Ra...

Страница 15: ...oted file a claim immediately with the carrier and contact the factory Storage All components of the SSB T SSB A single side break disconnect switch are suitable for outdoor use and do not have any sp...

Страница 16: ...nge end live parts assembly see Figure 2 Rotate the insulator bearing to the fully closed position Figure 2 Hinge End Figure 3 Contact End Switch Open 1 4 Stack insulators Consult your single pole sub...

Страница 17: ...ecessary Bolt bases solidly to the structure Rigging used to hit the poles should be attached to the base with steadying guides attached to prevent lipping of the switch pole Do not lift the switch by...

Страница 18: ...slightly loose Manually close the blade and allow the contact to center itself If the contact is entering the blade too low or too high use the jacking bolts to align and tighten the contact in place...

Страница 19: ...ntact pressure at the hinge and contact end To increase the contact pressure tighten the contact adjusting bolt Figure 6 Be cautious about applying too much pressure as it may cause galling of the sil...

Страница 20: ...The arcing horns should have light pressure not forcing the blade into place when closing See Figure 7 Figure 7 Adjusting Arcing Horn Check Single Pole Adjustments Be sure each single pole is properly...

Страница 21: ...stable arm in inch increments or less and allow the clevis to reposition itself the same distance shorten ing the pipe e Test operate again and adjust as necessary Figure 8 Operating Mechanism Adjustm...

Страница 22: ...es solidly to the structure Rigging used to hit the poles should be attached to the base with steadying guides attached to prevent lipping of the switch pole Do not lift the switch by attaching to the...

Страница 23: ...d special operation requirements Table 1 Recommended Installation Maintenance Table Installation Tests Patrolling Inspection 6 month Routine 5 Year Periodic 10 Year Insulators Contamination X X X X Da...

Страница 24: ...on items Routine Inspection Maintenance 5 year Routine inspection is performed on a de energized unit The frequency of the inspection is determined by the local conditions and policies of the owner of...

Страница 25: ...t are virtually identical Refer to the Operating Mechanism Drawing provided with your switch and follow these steps 1 Have all switch poles completely closed Install all components shown on the Operat...

Страница 26: ...ses are specified one is generally attached to the adjustable arm and two more to the center phase switch arm Refer to the plan view of the operating mechanism drawing and the Illustration above Opera...

Страница 27: ......

Страница 28: ...a Avenue Hampton Georgia 30228 Phone 770 946 4562 Fax 770 946 8106 E mail support southernstatesllc com http www southernstatesllc com 2020 Southern States IB 122 SSB T SSB A 72 5 Rev 2 06162020 Print...

Отзывы: