Page 5 of 21
Receiving, Handling, & Storage
Receiving, Handling, & Storage
Receiving & Unpacking
Unpack the equipment and check for damages or shortages immediately. The bill-of-material
from the Unit Assembly (switch) and Operating Mechanism drawings should be used for this
purpose. If damage or a shortage is noted, file a claim immediately with the carrier and contact
the factory.
Storage
All components of the EV-2H vertical break disconnect switch are suitable for outdoor use and
do not have any special storage requirements. If a motor operator is furnished be sure to
connect the heater circuit, using the provided external wiring, while the unit is in storage.
Discard the wiring upon installation.
Typical crating is intended for storage less than 1 year. If long term storage is required please
notify factory at time of order placement so that special crating can be used.