Page 15 of 22
Installation & Adjustment Procedures
5. After mounting all op-mech components, match-mark all clevis connections, the adjustable arm,
and the switch operating devices’ coupling, so that any slippage occurring during trial
operations can be readily detected.
Refer to
Figure 13: Typical Operating Arrangement
Vertical Bearing
Pipe Collar
Adjustable Arm
Vertical Pipe
Set
Match-
Match-mark
Содержание EC-2V
Страница 1: ...TYPE EC 2V Aluminum Center Break Vee Disconnect Switch ALL Ratings INSTRUCTION INSTALLATION MANUAL...
Страница 2: ...Page I The Quality Name in High Voltage Switching THIS PAGE LEFT INTENTIONALLY BLANK...
Страница 6: ...Page V The Quality Name in High Voltage Switching THIS PAGE LEFT INTENTIONALLY BLANK...
Страница 7: ...Page VI The Quality Name in High Voltage Switching Type EC 2V...
Страница 31: ...Page 22 of 22 Recommended Inspection Maintenance Comments...