background image

4/16

Form 759 (04.16) SOR Inc. 

Electrical Connections

When the process is adhesive, i.e. it tends to coat the sensor, it may be desirable to mount 
it on a 45° angle to reduce product build-up and to increase its effective surface area. (See  

 and 

)

Placement and orientation of the sensor in a vessel is frequently determined by available 
nozzles. The sensor should be away from fill points to avoid false trips. The insulator 
bushing on the sensor should protrude a minimum of 1” from the inner wall of the vessel. 
The sensor must not touch any metal, nor should conductive product build-up be allowed 
to bridge between the sensor and a grounded metal tank wall. 

This product must be installed with an explosion proof breather vent per 
Agency requirements and the National Electric Code-Article 501, Section F, 
paragraph 3.

Electrical power must be disconnected from explosion proof/intrinsically 
safe models before the cover is removed. Failure to do so could result in 
severe personal injury or substantial property damage.

 Remove the housing cover. Ensure that all wiring conforms to all applicable local and 

national electrical codes and install unit(s) according to relevant national and local 
safety codes.

 Connect the positive loop power wire to the terminal marked “+”.

 Connect the negative loop power wire to the terminal marked “-”.

 Replace the cover.

 Apply power.

Post-Installation Calibration

Units in Hazardous Locations — Prior to calibration, make certain that the 
work area is declassifi ed before removing the explosion proof cover to 
calibrate the unit. Failure to do so could result in severe personal injury 
and/or substantial property damage.

 Turn the set-point adjustment to the full clockwise position. The LED should be off 

 

(in Hi Level Fail-safe mode).

 Turn the adjustment slowly counter-clockwise until the LED just changes state (on).

 Raise the material level until it is above the sensing element. The LED should be off.

 Turn the adjustment slowly counter-clockwise until the LED illuminates. Then turn the  

 

adjustment 1/2 turn clockwise (LED off) to complete the calibration.

Содержание 651 K9 RF

Страница 1: ...istered Quality System to ISO 9001 Design and specifications are subject to change without notice For latest revision go to SORInc com Table of Contents Pre Installation I O and Calibration 1 2 Installation 3 Electrical Connections 4 Post Installation Calibration 4 SOR RF Probe Grounding Screen 5 Control Drawings 6 9 Instructions for EMC 10 Spare Parts 10 Information for IEC Listed Product 10 Main...

Страница 2: ...Usually 1 2 turns will locate the new null point When practical use a small container of actual process material to calibrate the control If the actual process vessel is metal use a metal container coffee can etc and ground it to the instrument housing If the actual process vessel is an insulator such as fiberglass use a plastic container Immerse the sensor in the process material the LED should t...

Страница 3: ...zle or half coupling Allow a 4 turn radius See and Sometimes open tanks vats sumps or basins require a locally made bracket mount similar to that shown in See Optional configuration is a raised face or flat face ANSI flange See Form 1100 for selection See g and Orientation The control can be mounted in any position Sensitivity is optimized when the greatest surface area of the sensor is parallel t...

Страница 4: ...e to do so could result in severe personal injury or substantial property damage Remove the housing cover Ensure that all wiring conforms to all applicable local and national electrical codes and install unit s according to relevant national and local safety codes Connect the positive loop power wire to the terminal marked Connect the negative loop power wire to the terminal marked Replace the cov...

Страница 5: ... SOR Supplied Stilling Well optional Probe Center Conductive Element IMPORTANT Do not provide separate earth grounding for the process connection This can create a parallel grounding circuit that will impair operation and calibration Do not provide separate earth grounding for the process connection This can create a parallel grounding circuit that will impair operation and calibration ...

Страница 6: ...6 16 Form 759 04 16 SOR Inc Control Drawing Drawing 9093008 ...

Страница 7: ...Form 759 04 16 SOR Inc 7 16 Control Drawing Drawing 9093010 ...

Страница 8: ...8 16 Form 759 04 16 SOR Inc Control Drawing Drawing 9093011 ...

Страница 9: ...Form 759 04 16 SOR Inc 9 16 Control Drawing Drawing 9093009 ...

Страница 10: ...robe wire Short Fat Bead Certificate Number IECEx BAS 05 0054X Issue 2 Standards IEC 60079 0 2011 Ed 6 and IEC 60079 11 2011 Ed 6 Listing Ex ib IIB Tx Gb 40 C Ta 80 C Certificate Number Baseefa 12ATEX0084X Standards IEC 60079 0 2011 Ed 6 and EN60079 11 2012 Condition of Safe Use This apparatus may not be capable of withstanding the insulation test required by Clause 6 4 12 of IEC 60079 11 1999 Thi...

Страница 11: ...erial 1 Bad circuit switch 2 The oscillator is not working Call the factory Calibration drifts 1 Sensitivity improperly set 2 Highly conductive product 3 Heavy conductive build up on the sensor 1 Recalibrate according to Post Installation Calibration Instructions on page 3 2 Use sheather sensor 3 Use sheather sensor and periodically remove build up Corroded sensor Process material has chemically a...

Страница 12: ...on Proof Integral B C 96 0 3 78 116 7 4 59 A LENGTH PER MODEL NUMBER 19 1 0 75 INACTIVE SHEATH ONLY D INACTIVE SHEATH LENGTH PER MODEL NUMBER 3 4 NPTF ELECTRICAL CONNECTION PROCESS CONNECTION SEE TABLE 1 1 Linear mm inches Drawing 0390654 Dimensions are for reference only Contact the factory for certified drawings for a particular model number SENSOR STYLE D BARE 12 7 0 50 SHEATH 15 9 0 63 BARE WI...

Страница 13: ...il 50 8 2 00 31 8 1 25 28 4 1 12 SEE DETAIL A DUAL CABLE PROBE DETAIL DUAL RIGID PROBE DETAIL MINIMUM CLEARANCE HOLE FOR INSTALLATION 54 9 2 16 36 5 1 44 22 2 0 88 D 3 4 16 UNF 2B X 11 1 0 44 Linear mm inches Drawing 0390654 Linear mm inches Drawing 0390654 Dual Cable Probe Detail Dimensions are for reference only Contact the factory for certified drawings for a particular model number ...

Страница 14: ...Identification Location of Serial Number First Two Numbers Indicate Year of Manufacture General Information for ATEX Certified Models Location of ATEX Listing Information Drawing 8924119 Drawing 0720527 Manufacturer s Registered Trademark Manufacturer s Registered Trademark ...

Страница 15: ...f America April 20 2016 ATEX Directive 2014 34 EU Equipment Intended for use in Potentially Explosive Atmospheres IEC 60079 0 2011 IEC 60079 11 2011 EN 60079 11 2012 II 2G Ex ib IIB T4 Gb 40 C Ta 80 C EC Type Examination Certificate Baseefa 12ATEX0084X IECEx BAS 05 0054X Issued August 16 2005 Baseefa Ltd Notified Body No 1180 Rockhead Business Park Staden Lane Buxton Derbyshire SK17 9RZ United Kingd...

Страница 16: ...16 16 Form 759 04 16 SOR Inc 14685West105thStreet Lenexa KS66215 913 888 2630 800 676 6794USA Fax913 888 0767 Registered Quality System to ISO 9001 SORInc com ...