1
Fit the lever (LDG-A) on
shafts
A
–
C
and install it.
shaft
A
shaft
C
4
type-E stop ring 2.0
shaft
A
shaft
C
LEVER (LDG-A) / (LDG-B)
shaft
B
GEAR (LDG-FT)
3
Align hole in the gear (LDG-D)
with hole in the lever (LDG-A).
gear (LDG-FB)
hole
lever (LDG-A)
2
Move the lever (LDG-B)
in the arrow direction.
1
tension spring (lever LDG)
4
gear (LDG-FT)
5
polyethylene washer
hole
2
Pull the lever in the
arrow direction.
3
Fit the lever (LDG-B) on
shafts
A
and
C
and
install it.
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299