5
MZ-R900
• This set can be disassembled in the order shown below.
3-1.
DISASSEMBLY FLOW
SECTION 3
DISASSEMBLY
Note:
Follow the disassembly procedure in the numerical order given.
3-2.
PANEL ASSY, BOTTOM
3-2. PANEL ASSY,
BOTTOM
3-3. PANEL ASSY,
UPPER SECTION
SET
3-4. “LCD MODULE”,
“PANEL ASSY, UPPER”
3-6. “CASE ASSY, BATTERY”,
“MAIN BOARD”
3-8. “MD MECHANISM DECK
(MT-MZR900-171)”,
“CHASSIS ASSY, SET”
3-7. STRIP,
ORNAMENTAL
3-5. MAIN BOARD ASSY
3-9. SERVICE ASSY, OP
(LCX-4R)
3-10. HOLDER ASSY
3-11. MOTOR FLEXIBLE BOARD
3-12. MOTOR, DC (SLED) (M602)
3-13. “MOTOR, DC (SPINDLE) (M601)”,
“MOTOR, DC (OVER WRITE HEAD UP/DOWN)
(M603)”
5
two screws
(1.4)
6
Remove the “panel assy, bottom”
in the direction of arrow
A
.
5
screw (1.4)
5
two screws
(1.4)
4
Close the
battery terminal (plus).
1
Open the
lid, battery case.
3
lid, battery case
S802
S801
2
claw
A
knob (hold)
Note: On installation,
adjust the position of
both two switches (S801, S802)
and two knobs (hold).