– 22 –
SECTION 6
ELECTRICAL ADJUSTMENTS
6-1.
BASE UNIT SECTION
• Make the set in Test mode (see page 18)
1. Checking RX I&Q Output Level
Setting:
Procedure:
1. Place the base unit in the Continuous Receive mode (CH1,
LNA ON, AGC ON).
2. Set the SSG frequency to the frequency on CH1 + 300 kHz,
and the RF output level to –95 dBm.
3. Measure the output level of RXIN, RXIP, RXQN and RXQP
with a level meter. At this time, confirm with an oscilloscope
that a sine wave of 300 kHz is output.
4. Confirm that the measured output level is –31.0 to –24.0
(TYPICAL –27.0) dBV. If IC951 was replaced (there is no ID
data), the output level is –31.0 to –24.0 dBV.
5. Also, execute steps 1 through 4 for the channels 10 and 20.
* For the frequency on each channel, see page 15.
2. Checking TX Center Frequency
Setting :
• short: TP918
↔
TP919
Procedure:
1. Short TP918 and TP919 (GND) on the BASE MAIN board in
2. Place the base unit in the Continuous Transmit mode (CH1,
3. Measure the ANT OUT frequency of the RF module in the
base unit using a frequency counter.
4. Confirm that the measured frequency is 903.600 MHz ±
3. Checking TX Output
Setting:
Procedure:
1. Place the base unit in the Continuous Transmit mode (CH1,
High power).
2. Measure the ANT OUT output of the RF module in the base
unit using a peak power meter.
3. Confirm that the measured output is 80 mW (MIN 30 mW).
4. Also, execute steps 1 through 4 for the channels 10 and 20.
CH10: 80 mW (MIN 30 mW)
CH20: 75 mW (MIN 25 mW)
+
level meter
oscilloscope
–
+
–
TP906: RXIP
TP905: RXIN
TP904: RXQP
TP903: RXQN
TP919: GND
SSG
ANTENNA TERMINAL
frequency counter
+
peak power meter
–
ANTENNA TERMINAL
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299