2-1
Note:
Follow the disassembly procedure in the numerical order given.
2-1. UPPER CASE REMOVAL
2-3. REAR PANEL REMOVAL
2-2. NK-11, RJ-80, SE-73 BOARD REMOVAL
2-4. FRONT PANEL SECTION REMOVAL
SECTION 2
DISASSEMBLY
SLV-ED1/ED2/ED3/ED4/ED5/ED6/ED7/EZ1/EZ4/EZ7
1
Two tapping screws
2
Two tapping screws
3
Upper case
2
NK-11 board
(ED7: MI,MN/
EZ7NZ)
3
Connector
(CN902)
1
Connector
(CN751)
6
Connector
(CN303)
5
RJ-80 board
(ED3/ED4/ED5/
ED6/ED7)
7
SE-73 board
(ED3/ED7FS)
4
Two screws
(BVTP3
×
12)
2
Harness
6
Two claws
5
Three claws
4
Claw
3
Claw
(EXCEPT ED1/
ED2/EZ1)
7
Rear panel
1
Power cord
(CN101)
ED4/ED5/ED6/
ED7: FS, MN
3
Connector
(CN423)
2
Flat cable
(CN105)
1
Flat cable
(CN424)
EXCEPT ED1/
ED2/EZ1
4
Three claws
5
Three claws
6
Front panel section
Содержание RMT-V245A
Страница 7: ...1 2 ...
Страница 8: ...1 3 ...
Страница 9: ...1 4 ...
Страница 10: ...1 5 ...
Страница 11: ...1 6 ...
Страница 12: ...1 7 ...
Страница 13: ...1 8 ...
Страница 14: ...1 9 ...
Страница 15: ...1 10 ...
Страница 16: ...1 11 1 11 E ...