– 53 –
KP-53HS10/61HS10
RM-Y902
RM-Y902
4-4. +B OVP CONFIRMATION
1. Connect a voltmeter to TP. OVP and ground.
2. Supply 120VAC to variable autotransformer.
3. Power on the Set.
4. Supply 150VDC to TP. OVP.
5. Check the OVP is activated.
4-1. HV REGULATION CIRCUIT CHECK AND
ADJUSTMENT
When replacing the following components marked with
on
the schematic diagram always check HV regulation, and if nec-
essary re-adjust.
: R8196, R8201
: C8018,C8064, C8066, C8070, C8074,
C8076,C8082
D8042
IC8002, IC8007, IC8008
Q8022
R8093, R8095, R8096, R8105, R8108
R8112, R8113, R8114, R8115, R8126
R8128, R8136, R8138, R8139, R8154
R8157, R8168, R8173, R8174, R8177
R8178, R8195, R8196, R8201
T8002 (LOT), T8003 (FBT)
HV BLOCK, D BOARD
[ D BOARD]
4-2. HV HOLD DOWN CIRCUIT OPERATION
CHECK AND ADJUSTMENT
When replacing the following components marked with
on
the schematic diagram always check hold-down voltage and if
necessary re-adjust.
: R8194, R8202
: C8018, D8026, D8032, D8035, D8050
IC8006, IC8009, IC8010
Q8021, Q8031
R8092, R8094, R8097, R8109, R8110,R8117,
R8118, R8121, R8123, R8125, R8129, R8135,
R8140, R8155, R8190, R8191, R8192, R8193,
R8194, R8198, R8202
T8002 (LOT), T8003(FBT)
HV BLOCK, D BOARD
Fig. 4-1
Remove the cap off from
the unused terminal and
connect a static voltmeter
there.
OPERATION CHECK
1. Connect a HV static voltmeter to the unconnected plug of
the high-voltage block.
2. Power on the set.
3. Receive dot signal patterm.
4. Check that the HV static voltmeter is readind 34.0
±
0.5V dc.
HV Regulation ADJUSTMENT
1. Repart step
1
as above.
2. Connect 33k
Ω
variable resistor, set to maximum value, to
CN8008.
3. Power on the set.
4. Receive dot signal pattern.
5. Gradually lower the value of the variable resistor until the
static voltmeter is reading 34.0
±
0.5 kVdc.
6. Switch off the swt.
7. Remove the VR connected across CN8008, and measure its
value.
8. Solder a resistor value, nearest to the measured value, across
CN8008.
9. Reconfirm operation check.
SECTION 4
SAFETY RELATED ADJUSTMENTS
OPERATION CHECK
1. Connect a HV static voltmeter to the unconnected plug of
the high-voltage block.
2. Connect a 33k
Ω
variable resistor, set to maximum value,
across CN8008.
3. Power on the set.
4. Receive dot signal pattern.
5. Gradually lower the value of the variable resistor and check
that the hold-down circuit operates at a static voltmeter read-
ing of 31.0
±
0.5kV dc when the raster disappears.
HV HOLD-DOWN ADJUSTMENT
1. REPART STEPS
1
~
5
as above.
2. Just at the point hold-down circuit begins to operate switch
off the set.
3. Remove the VR connected across CN8008, and measure it’s
resistance.
4. Solder a resistor value, nearest to the measured value, across
CN8008.
5. Reconfirm operation check.
4-3. +B MAX VOLTAGE CONFIRMATION
The following adjustments should always be performed
when replacing IC6101.
1. Supply 130.0
±
2.0VAC to variable autotransformer.
2. Receive dot signal pattern and set the PICTURE and
BRIGHTNESS settings to their minimum.
3. Confirm the voltage of TP +B 135V is less than 137.0Vdc.
4. If step 4 not satisfied , replace IC6101 and repeat above steps.
[ G BOARD]
Содержание KP 53HS10
Страница 2: ... 2 KP 53HS10 61HS10 RM Y902 RM Y902 SPECIFICATIONS ...
Страница 10: ... 10 ...
Страница 11: ... 11 ...
Страница 12: ... 12 ...
Страница 13: ... 13 ...
Страница 14: ... 14 ...
Страница 15: ... 15 ...
Страница 16: ... 16 ...
Страница 17: ... 17 ...
Страница 18: ... 18 ...
Страница 19: ... 19 ...
Страница 20: ... 20 ...
Страница 21: ... 21 ...
Страница 22: ... 22 ...
Страница 23: ... 23 ...
Страница 24: ... 24 ...
Страница 25: ... 25 ...
Страница 26: ... 26 ...
Страница 27: ... 27 ...
Страница 28: ... 28 ...
Страница 29: ... 29 ...
Страница 30: ... 30 ...
Страница 31: ... 31 ...
Страница 32: ... 32 ...
Страница 33: ... 33 ...
Страница 34: ... 34 ...
Страница 35: ... 35 ...
Страница 91: ......
Страница 92: ......
Страница 93: ......