– 13 –
KLV-32S530A, 26, 32, 37 S550A
RM-GA016
RM-GA016W
5-1-3. Insert Connector Assy 14P
5-1-4. Attach Sheet Core, C (X3) to main bracket as shown.
A
1) Attach Sheet Core, C (X2) to frame bottom as shown.
2) Insert Conn Assy 14P to inverter and GT3 PWB as shown. Attach Sheet Core, C as shown.
Note: When inserting LVDS harness to panel, make sure it is
fully inserted and in the correct direction as shown.
3) Attach Sheet Core, C (X2) to LVDS harness.
4) Attach Sheet Core, C to Connector Assy 14P
and LVDS harness.
3) Attach Tape, Shield followed by Sheet Core, C on to LVDS harness.
4) Insert screw on to earth clamp on LVDS harness.
5) Attach Sheet Core, C to Connector Assy 14P and LVDS harness.
6) Attach Sheet Core, C on to LVDS harness
For Non-CISPR models
For CISPR models
Attach Sheet Core, C to
LVDS harness.
Non-
CISPR
model
CISPR
model
NG
OK
Dress SP Conn Assy
4P to the left of this
line (edge of BT2 PWB)
Dress SP Conn Assy 4P; Lead
Assy, Earth and Conn Assy 10P
Wires along this path (behind Under cover)
and below raised area of frame bottom
Attach Sheet Core, C
towards the left side of
frame bottom.
Frame
bottom
Dress SP Conn Assy 4P and Conn
Assy 10P using Sheet Core, C. Use
datum line to position Sheet Core, C.
Attach Tape, Shield followed
by Sheet Core, C to LVDS
harness.
Attach Sheet Core, C to
Conn Assy 14P and LVDS
Insert screw on to
earth clamp on
LVDS harness.
Attach Sheet Core, C (X2) to
LVDS harness.
Attach Sheet Core, C to
conn Assy 14P and LVDS
harness
Attach Sheet Core, C to
Conn Assy 14P and SP
Conn Assy 4P.
Attach Sheet
Core, C to
main bracket
(X3).
Dress Conn Assy
10P;
Lead Assy, Earth
and
SP Conn Assy 4P
together.
Insert Conn Assy 14P to
GT3 PWB.
Attach Sheet Core, C (X1).
1
1
2
2
4
3
3
6
5
4
1