C903
1228-1147 rev. 1
ABOUT
AB
O
U
T
Step 2:
Connect the CST-75 charger Red or White wire to the Plus Output and the Black wire to the Minus
(GND) Output at backside of the Power Supply Channel 2 (DCIO/SEPI) according to Picture 8.
Picture 8
Step 3:
Cut off insulating material from back side of the charger plug according to Picture 9.
Picture 9
Step 4:
Connect DCIO Cable and SEPI Interface Cable – A1 according to Picture 10.
Picture 10
Equipment List
SEPI Interface Cable – A1
Location: CSPN – Repair Instructions – Mechanical – Tool Catalogue – RepairToolsCatalogue.pdf
Part number: KRY 101 1119/1
See Picture 6.
Picture 6
Power Cable RED to Power Supply Channel 1 (VBATT)
Maximum Length: 1m
Location: CSPN – Repair Instructions – Mechanical – Tool Catalogue – RepairToolsCatalogue.pdf
Power Cable BLACK to Power Supply Channel 1 (VBATT)
Maximum Length: 1m
Location: CSPN – Repair Instructions – Mechanical – Tool Catalogue – RepairToolsCatalogue.pdf
Customized Power Supply Channel 2 Cable (DCIO/SEPI)
Customize the cable according to following instructions below:
(Step 1, Step 2, Step 3 and Step 4)
Step 1:
Take the CST-75 battery charger and cut of the charger according to Picture 7.
Picture 7
Note!
The Cable length must be exact 1.3 metre.
SEMC Troubleshooting Manual
5
(129)