Sontay RE-1P-7 Скачать руководство пользователя страница 4

 

Tel: +44 (0)1732 861200  -  E-mail: [email protected]  -  Web: www.sontay.com 

© 2017 Sontay Limited. All rights reserved 

Page 4 of 4 

 

RE-1P-7 

1-Phase Din-Rail Mount 7kW 

Issue Number: 7.1 

Date of Issue: 28/04/2020 

 

 

Four Elms Road 

 Edenbridge 

Kent 

 TN8 6AB 

 UK 

 

 

Whilst every effort has been made to ensure the accuracy of this specification, Sontay cannot accept responsibility for damage, injury, loss or 

expense from errors or omissions. In the interest of technical improvement, this specification may be altered without notice. 

 

Operation, Installation & Configuration (continued)

 

 
Cycle Time  

The unit is supplied with the cycle time set to minimum (fully anticlockwise). An on board potentiometer is provided to facilitate adjustment of the cycle 
time in the range of 5 (default) to 60 seconds. Adjustment is not normally required, incorrect adjustment can cause an overload condition.   

 
Maximum Heating Load 

The power rating of the units are given as a guide. The maximum current (which is dependent on the actual supply voltage and heating load) must not be 
exceeded. 
 

Jumper Settings & Connections 
 

Voltage inputs: 

 

 

 

 

 

Current inputs: 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
   0-10Vdc                     0-5Vdc 

           2-10Vdc 

     1-5Vdc                            4-20mA                    2-10mA                   0-20mA                   0-10mA 

I/V Jumper 

I/V Jumper 

C

o

nt

ro

l Si

gna

 

0V

 

 

NO

 C

O

NN

EC

TIO

N

 

 

NO

 C

O

NN

EC

TIO

N

 

 

24V Al

ar

m

 (

o

ut

pu

t)

 

 

0V Al

ar

m

 (

o

ut

pu

t)

 

Lo

ad
 

N

eut

ral

 c

o

nn
ec

tio

 

Отзывы: