Sontay GS-S-CO-LED Скачать руководство пользователя страница 2

Whilst every effort has been made to ensure the accuracy of this specification, Sontay cannot accept responsibility for damage, injury, loss or 

expense resulting from errors or omissions. In the interest of technical improvement, this specification may be altered without notice. 

 

Page 2 of 2 

UK Sales Tel: 0845 345 7253 

International Tel: +44 1732 861225 

For the latest information and product updates, register at www.sontay.com 

GS-S-CO-LED 

Issue: 5.0 

Date Of Issue: 19/12/2011 

© 2011 Sontay Limited. All rights reserved. 

Relay jumpers 

J2  J1 

1    2    3     4    5    6     

RS485 A (Opt

io

nal

RS485 B

 (Opt

io

nal

Rel
ay

 C 

Rel
ay

 NO 

0V

 

24V
ac

/dc 

Technical Overview 

LED Indication

 

The GS-S-CO-LED has 6 LED indicator lights which change 
colour based upon concentration levels. This allows for easy 
visual awareness of the CO levels, with either a relay or 
RS485 interface output.  
 

Installation  

 
1.  Select a location on a wall of the controlled space which 

will give a representative sample of the prevailing room 
condition.    

 

 

 

           

Avoid sitting the sensor in direct sunlight, near 
diffusers and steam sources. 

 

 

 

 

 

 

 

2.  Gently remove the front cover from the back plate. The 

front plate is removed by pressing the tab at the top of 
the sensor with a flat bladed screwdriver. Gently slant 
the screwdriver and this will separate the front cover 
from the back plate.  

 

 

 

 

 

3.  Using the base as a template mark the hole centres and 

fix to the wall with suitable screws. Alternatively the 
base plate can be mounted on to a conduit box or a 
standard recessed back box. 

 

 

 

 

 

 

 

4.  Feed cable through the knockout in the base of the 

housing and terminate the cores at the terminal block. 
Install wiring into terminal blocks as required, and push 
excess wire back into wall or junction box.   
 

 

5.  Select the relay switching point using jumpers J1 & J2. 

 

 

 

 

 

6.  Ensure that the supply voltage is within the specified 

tolerances.   

 

 

 

 

 

 

7.  Replace the front cover to the base plate until a click is 

heard. 

 

 

 

 

 

 

 

 

8.  Power the unit, pre-commissioning checks can be made 

after 10 minutes. Full commissioning should not be   
carried out for at least 36 hours.    

 

 

 

 

 

 

9.  It is recommended that screened cable be used and that 

the screen should be earthed at the controller only. Care 
should be taken not to lay control signal wiring in close 
proximity to power or other cables which may produce 
significant electromagnetic noise.   

1st Green LED   

 

<20ppm 

1st & 2nd Green LED’s   

>20ppm 

1st Yellow LED   

 

>50ppm 

1st & 2nd Yellow LED’s   

>100ppm  

1st Red LED 

 

 

>200ppm 

1st & 2nd Red LED 

 

>300ppm 

 

Relay Jumper Settings 

The default jumper position is 100ppm 
 

Connections 

CO Value

ON

OFF

J1 = OFF J2 = OFF

50ppm

>55ppm <45ppm

J1 = OFF J2 = ON

100ppm >105ppm <95ppm

J1 = ON J2 = OFF 300ppm >305ppm <295ppm

J1 = ON J2 = ON

500ppm >505ppm <495ppm

Status

Jumpers

Отзывы: