Sonnen sonnenBatterie hybrid 9.53/10 Скачать руководство пользователя страница 34

 

 
1510387/11 

 

 

 

(a) 

(b) 

(c) 

(d) 

(e) 

(f) 

(g) 

Содержание sonnenBatterie hybrid 9.53/10

Страница 1: ...Operating instructions for operators sonnenBatterie hybrid 9 53 KD 505 Part no 22356 Version X01 info sonnen de sonnen de...

Страница 2: ...nfo sonnen de Document Document number 505 Part number 22356 Version X01 Valid for AU NZ Publication date 16 01 2019 102152587 IMPORTANT Read this documentation carefully before installation operation...

Страница 3: ...inciple 12 3 4 2 Feed in limit 13 3 4 3 Intelligent charging management 14 3 5 Function of the sonnen Eclipse 16 4 Switching on the storage system 17 4 1 Switching on the grid voltage 17 4 2 Switching...

Страница 4: ...iv Operating instructions sonnenBatterie hybrid 9 53 9 Troubleshooting 28 10 Uninstallation and disposal 29 10 1 Uninstallation 29 10 2 Disposal 29 ANNEX 30 11 Manufacturer s Warranty sonnen Australi...

Страница 5: ...gnation in this document sonnenBatterie hybrid 9 53 Storage system 1 3 Explanation of symbols DANGER Extremely dangerous situation leading to certain death or serious injury if the safety information...

Страница 6: ...y modules outside of its storage system Failure to comply with the conditions of the warranty and the information spe cified in this document invalidates any warranty claims 2 2 Operating the storage...

Страница 7: ...y Despite their careful design the battery cells inside the battery modules may corrode or experience thermal runaway in the event of mechan ical damage heat or a fault This can have the following eff...

Страница 8: ...itch off the storage system to electrically isolate it Switch off the mains fuses in the building If the storage system and or mains fuses cannot be safely switched off Observe the minimum distances s...

Страница 9: ...nt 0 A Mains connection single phase L N PE Max ext overcurrent protection 25 A 1ph Mains topology TN TT Mains connection fuse Miniature circuit breaker Type B 20 25 A Photovoltaic PV input DC Number...

Страница 10: ...alvanic isolation functional insulation Power meter Voltage measurement inputs Nominal voltage AC 230 V L N 400 V L L max connectible conductor cross section 1 5 mm Clamp on current transformer Max me...

Страница 11: ...atters The following information is specified on the type plate Item designation Item number Technical data of the storage system 3 3 Symbols on the outside of the storage system Symbol Meaning Warnin...

Страница 12: ...achine hob lamps refrigerator etc 4 Measurement of consumption 5 Public electrical mains The storage system 2 is connected to the PV system 1 and the public electrical mains 5 Furthermore the current...

Страница 13: ...witch on of consumers via sonnenSmart plug 4 Midday peak which must not be fed into the electrical mains To prevent production reduction and therefore energy loss the excess energy is first stored in...

Страница 14: ...cient storage capacity must still be available for this Full charging of the storage system until evening so there is sufficient energy for night time The intelligent charging management only takes ef...

Страница 15: ...ay meaning that the surplus exceeding the feed in limit after this point would no longer be able to be stored in the battery To stay within the Feed in limit P 13 the power of the PV system would need...

Страница 16: ...on consumption from the previous week Drastically fluctuating consumption therefore negatively impacts the quality of the consumption forecast The more consistent the consumption the more accurate th...

Страница 17: ...tem and the in verter I 0 SPV Illustration 7 Switching SPV on Switch the PV disconnector SPV on If there are external DC isolating switches Switch these on too 4 3 Switching on the fuse switch F1 NOTI...

Страница 18: ...9 53 The storage system then starts up and performs a self test Once the self test is success ful the storage system is ready to operate When the storage system has started up and is running in norma...

Страница 19: ...ost important current data for the storage system 72 14 BEZOGEN Ladezustand 86 AUTARKIE innerhalb der letzten 7 Tage 6 kWh Batterie 1 2 3 4 5 Illustration 9 Home screen No Description 1 Self sufficien...

Страница 20: ...e login window opens as shown on the left 3 Enter your access data which was provided as part of the scope of delivery 4 Click on the Log in button 6 2 Using the overview page The overview page shows...

Страница 21: ...e system automatically activ ate or deactivate the smart plug click on the AUTO button Under Self Consumption Maximization set the excess energy level at which the con sumer should be activated and th...

Страница 22: ...ate Clicking on the button confirms the date selection 2 Clicking on the day week month or year button defines the time frame shown in the graph 3 Clicking on the button provides the option of printin...

Страница 23: ...mple below shows how it works in a facility with limitation of the feed in to the public grid This power limitation is a special feature that is used only in cases where the network owner demands it I...

Страница 24: ...t it will be fully charged by evening 6 From this point PV generation is no longer sufficient to cover consumption The differ ence is discharged from the storage system 7 The storage system discharge...

Страница 25: ...rt represents self production Self production is the part of the con sumed energy that was not taken from the mains 6 6 Using the forecast page The forecast page shows the probable course of consumpti...

Страница 26: ...he storage system should be charged to 100 on a sunny day and the charging status should drop significantly overnight Table 5 Checking function 7 2 Cleaning NOTICE Use of unsuitable cleaning agent and...

Страница 27: ...om the public grid for long periods of time Never continue to operate battery modules which have been deep dis charged 8 1 Switching the storage system off F1 ON OFF I O ON OFF I O ON OFF I O I 0 SPV...

Страница 28: ...system is connected to the home network router The sonnen Eclipse of the storage sys tem illuminates red The storage system has detected a problem that is preventing normal op eration or may cause dam...

Страница 29: ...n their original packaging only If you no longer have the original packaging new packaging can be requested from sonnen GmbH Never transport damaged battery modules CAUTION Improper disposal of batter...

Страница 30: ...ANNEX 30 36 Operating instructions sonnenBatterie hybrid 9 53 ANNEX 1 Warranty You can find the manufacturer s warranty on the following pages...

Страница 31: ...May 2017 a b i ii c d e f...

Страница 32: ...1510387 11 2 a b a i ii iii iv v b c d e f g h i...

Страница 33: ...1510387 11 3 a b a b a b c...

Страница 34: ...1510387 11 4 a b c d e f g...

Страница 35: ......

Страница 36: ...sonnen GmbH Am Riedbach 1 D 87499 Wildpoldsried...

Отзывы: