
5
Assembly
5.5.2 Drilling holes
Figure 8: Drilling template (all dimensions in mm)
1
Drilled holes for wall bracket
2
Additional drilled holes
3
Levelling mat
Tools needed
O Pencil
O Spirit level
O Folding meter stick
O Hammer drill
O Concrete drill (6 mm)
For main cabinet suspended from wall:
►
Drill the holes labelled (1) and (2).
For standup storage system (consisting of main cabinet and add-on cabinet):
►
Drill the holes labelled (1).
For a main cabinet suspended from the wall it is still advisable to keep to the
dimensions in Figure above. Because if you add to the storage system at a later
date you need not drill any new holes.
Page 26 of 115
KD-262 | Part-No 52199 | EN | Version 1.00
200
100
100
110
110
620
16
10
15
32
83
8,
5
71
0
1
2
12
8,
5
82
2
90
0
10
3
Содержание sonnenBatterie eco 7.0 Series
Страница 7: ...Contents 17 Commissioning report 115 KD 262 Part No 52199 EN Version 1 00 Page 7 of 115...
Страница 112: ...16 EU Declaration of Conformity Page 112 of 115 KD 262 Part No 52199 EN Version 1 00...
Страница 113: ...EU Declaration of Conformity 16 KD 262 Part No 52199 EN Version 1 00 Page 113 of 115...
Страница 114: ...sonnen GmbH Am Riedbach 1 D 87499 Wildpoldsried t 49 0 8304 92933 444 o info sonnenbatterie de...