7. PREPARATION FOR USE
INSPECTION
Prior to installing the Ultrasonic Processor, perform a visual inspection to detect any evidence of
damage which might have occurred during shipment. Before disposing of any packaging material,
check it carefully for small items.
The Ultrasonic Processor was carefully packed and thoroughly inspected before leaving our
factory. The carrier, upon acceptance of the shipment, assumed responsibility for its safe delivery.
Claims for loss or damage sustained in transit must be submitted to the carrier.
If damage has occurred, contact your carrier within 48 hours of the delivery date. DO NOT
OPERATE DAMAGED EQUIPMENT. Retain all packing materials for future shipment.
ELECTRICAL REQUIREMENTS
The Ultrasonic Processor requires a fused, single phase 3-terminal grounding type electrical
outlet capable of supplying 50/60 Hz at 100 volts, 115 volts, 220 volts, or 240 volts, depending
on the voltage option selected. For power requirements, check the label on the back of the unit.
INSTALLING THE ULTRASONIC PROCESSOR
The Ultrasonic Processor should be installed in an area that is free from excessive dust, dirt,
explosive and corrosive fumes, and extremes of temperature and humidity. If processing
flammable liquids use an approved fume hood and do not place the power supply in the fume
hood.
When positioning the unit, be sure to leave adequate space behind the unit so that all
connections can be easily disconnected.
WARNING
For your personal safety, do not, under any circumstances, defeat the
grounding feature of the power cord by removing the grounding prong.