background image

Platné od: 7.3.2017 

Somati system s.r.o., Jihlavská 510/2c, 664 41 Troubsko 

IČ: 29260159, DIČ: CZ29260159 

tel: +420 547 427 011, www.somati-system.cz 

 

1.

 

NOTIFICATION BEFORE INSTALLATION 

Dear customer, 

We are glad that you decided to fire rolling doors from Somat system Ltd. 
Please  read  these  instructions  and  follow  him.  It  gives  you  important  information 

about the safe installation and operation of your doors and specialized maintenance and repairs. 

Professional service and careful maintenance significantly affects performance and 

usability  of  the  device  gate.  Operating  errors  and  improper  maintenance  lead 
to operational  faults,  which  can  be  avoided.  Your  satisfaction  and  long-term  operational 
reliability is ensured only when the professional operation and careful maintenance. 

Important instructions: 

 

Follow the instructions in this manual 

 

Improper  installation  or  improper  maintenance  the  door  could  lead 

to life-threatening  injuries.  For  your  own  safety  check  carried  out  by  a  qualified 
professional installation of company 

 

Transport sections of the door only on the special pallet 

 

The  doors  open  and  close  horizontally.  For  this  reason,  ensure  that  the  the  door 

during operation in the area of the door not stay any people - especially children 
- and no objects 

 

The appliance the door, use only if it is in perfect condition. Equipment failure the door can 

lead to life-threatening injuries 

 

Ensure that all the checks, repairs and cleaning equipment can not operate the door 

by a third party 

 

Do  not  alter  or  remove  any  functional  parts!  This  may  cut  out  important  safety 

components 

 

Do  not  install  any  additional  components.  All  components  are  precisely  adjusted 

to each  other.  Additionally,  components  may  overload  the  the  door  structure 
and lead to life-threatening injuries 

Working tools: 

 

Use only tools suitable for the installation of doors and related equipment 

Prepare the following working tools: 

 

Suitable lifting equipment (truck crane) lift roller on the consoles (make 

sure  the  total  weight  of  the  roller,  shown  on  the  mounting  dimension 

diagram) 

 

Suitable lifting platform or scaffolding 

 

Drill 

 

Grinder 

 

Set of keys 

 

Optical leveling device 

 

Aku screwdriver 

 

Taps (for mounting on a steel structure) 

 

Содержание RGS 120-H

Страница 1: ...7 Somati system s r o Jihlavská 510 2c 664 41 Troubsko IČ 29260159 DIČ CZ29260159 tel 420 547 427 011 www somati system cz 12 2015 Installation guidelines RGS 60 120 H EI 60 120 DP1 with engine FS 15 20 25 20 and 50 20 ...

Страница 2: ... KITS 5 4 INSTALLATION OF THE TOP FRAME 6 5 INSTALLATION OF THE SIDE GUIDES 10 6 ESTABLISHMENT OF THE HORIZONTAL LABYRINTH 12 7 INSTALLATION OF BEARINGS AND ACTUATOR 13 8 COMPLETE THE CONSOLE WITH THE BRAKE 14 9 INSTALLATION OF THE PRESSING ROLLER 15 10 INSTALLATION OF THE ENGINE 16 1 Motor FS 15 20 1 16 11 INSTALLATION GEAR WHEELS AND CHAIN ON THE SHAFT 17 12 CONNECTION OF CONTROL PANEL 18 13 UNP...

Страница 3: ...ional installation of company Transport sections of the door only on the special pallet The doors open and close horizontally For this reason ensure that the the door during operation in the area of the door not stay any people especially children and no objects The appliance the door use only if it is in perfect condition Equipment failure the door can lead to life threatening injuries Ensure tha...

Страница 4: ... Set console for reeling roller 1 1 Left and right console for the roller 1 2 Console for the gravity brake 1 3 Gravity brake 1 4 Flanged bearing 1 5 Big gear wheel with chuck TAPER LOCK 1 6 Roller 1 7 Non insulated lamellas number according to the actual reports folded into the main roller 1 8 Connecting isolated lamellas 2 3 pcs on roller 1 lamella with riveted counterpart labyrinth 1 9 Appropri...

Страница 5: ...rial 3 Konstrukce 3 1 2 pcs of cross beams universal for front and back side 3 2 Top cross beam Top cross beam detail 3 3 2 pcs of longitudinal beams universal for front and back side 3 4 Roller track according to the number of assembly 3 5 Connecting material 4 Set console for the engine 4 1 Console for the engine 4 2 Motor FS 15 20 1 4 3 Small gear wheel 4 4 Output shaft engine pen 4 5 Cabel Fe ...

Страница 6: ... e g 8 1 Temperature sensor 8 2 Somke sensor 8 3 Combi sensor 8 4 Siren with flash beacon 9 Mounting material are delivered in standard bolts for mounting to the structure can be ordered according to the type of supporting structure walls steel construction Recommended anchors Type of wall Consoles Profiles Wall Horizontal bar Concrete Wedge Anchor 10x90 or 12x110 screw anchor Steel Screw nut wash...

Страница 7: ...Mark the center of the opening Create meter mark on both sides of the the door opening must be horizontal to the ground If either of greater dimensions than the doors according to the documentation Doors can not be installed less than or as large as in the documentation center of the access 1 1 1 2 1 2 hei ght of the acc ess H meter horizontal guideline 1m 1m width ordered size W Stan dard heig ht...

Страница 8: ...ings right and left 2 Longitudinal beam right and left 3 Console track right and left 4 Consoleof power roller without bearing right and left 5 The cross beam right left and center 6 Roller track 1 m distance location of welded brackets The upper frame as standard mounted on the ceiling or through the steel columns which can also order by type of order 2 4 1 3 6 5 1 view of the skeleton to be moun...

Страница 9: ...right beam frame installation 2 cross beams installation 3 roller track installation The edges of the console from the wall 80 nominally with upper beam 450 ceiling Uppe r beam 450 horizontal plane vertical plane from the most outgoing point of the wall In the case of the greater upper beam than 450 mm scotch the supporting consoles or order atypical 80 ...

Страница 10: ...orizontal plane not from the floor The bottom edge of the console according to assembly 1 m in standard cases height of console height of the access The actual width order nominal width see drawing The actual height order nominal height see drawing 1 2 190 450 Upper beam 140 50 50 left beam frame 140 right beam frame 1 2 190 width of the pitch consoles control size according to assembly 1 m ...

Страница 11: ...oubsko IČ 29260159 DIČ CZ29260159 tel 420 547 427 011 www somati system cz 9 The whole construction of the skeleton must be installed in vertical and horizontal plane and must be leveled not to be skewed X Y X Y Measure and compare diagonal structure at right angles ...

Страница 12: ...N OF THE SIDE GUIDES Description of the guide 1 Side guide RGS 60_part 1 2 Isolation 2x Promatect H thick 8mm 55 and Palusol 40x4 protection foil added together 3 Isolation Promatect H tl 8mm 70 4 Side guide RGS 60_part 2 5 Side guide RGS 60_part 3 1 Part A body of guide part on the wall 2 Part B guide cover 3 Connection screws M 6 1 4 Part B Part A 3 2 5 ...

Страница 13: ...bottom on the guide 2 Settle part Ainto the position left and right body of the guide 3 Align to the vertical plane Set up guides to the vertical and horizontal plane Part left Part right 1 m Nominal width of the hole 10 in the standard cases Inner pitch of the guide according to assembly wall Anchoring the appropriate anchoring material according to type of wall ...

Страница 14: ...th RGS 60 1 2 Promat 45x25 RGS 60 1 3 Palusol 45x6 RGS 60 1 Anchoring screw according to the type of wall Expand Separate Palusol that covers the holes for anchoring Settle into positions Installation of anchors to the wall Stick Palusol that covers anchoring screws o paint Promat by the contact adhesive Plant labyrinth on the side lines must match and build on the side guide 3 2 Side guide 1 Laby...

Страница 15: ...ww somati system cz 13 7 INSTALLATION OF BEARINGS AND ACTUATOR 1 Gravity brake FG 1 2 Bearing body 3 Main roller lamellas on the roller must be tied lamellas off the roller are connected with the roller The main roller with parts of the lamellas mount on top of the skeleton which is already attached to the ceiling 1 3 2 ...

Страница 16: ...ská 510 2c 664 41 Troubsko IČ 29260159 DIČ CZ29260159 tel 420 547 427 011 www somati system cz 14 8 COMPLETE THE CONSOLE WITH THE BRAKE 1 Screw CSN EN 24018 1 2 pcs 2 Washer CSN 021702_A 1 2 pcs 3 Gravity brake FG 1 FG 80 40 4 Matrix 2 pcs 4 1 2 3 ...

Страница 17: ...e from both sides the bearing bodies Bottom or side longitudinal beams insert roller bodies on the console and bearing bodies place the by middle oval holes slightly tighten screws Insufficient clamping screw housings adjust the roller so that the lamellas right seats and snapped to the counterpart labyrinth Fixed tighten the screws of bearings 3 internal side of the bearing body 2 external side o...

Страница 18: ...Č CZ29260159 tel 420 547 427 011 www somati system cz 16 10 INSTALLATION OF THE ENGINE 1 Motor FS 15 20 1 Motor FS 15 20 1 fix on the console by the screws 4 internal side 5 external side 1 Screw CSN EN 24018 18 4 pcs 2 Motor FS 15 20 1 3 Flats UNI 1 4 pcs inside the track console 3 2 1 ...

Страница 19: ...tallation clean the chuck 2 Fit the chuck into the wheel so that the non threaded parts fit with the threaded 3 Manually tighten the screws 4 Place the wheel on the shaft place and tighten the screws alternately Pinion gear ensure imbus by securing screw Fit the chain Shortcut the chain i fit necessary Contact by the connector Regulation for chain tensioning http www haberkorn cz retezy http www h...

Страница 20: ...né od 7 3 2017 Somati system s r o Jihlavská 510 2c 664 41 Troubsko IČ 29260159 DIČ CZ29260159 tel 420 547 427 011 www somati system cz 18 12 CONNECTION OF CONTROL PANEL Viz Manual electrical control panel ...

Страница 21: ...CKING LAMELLAS Extract lamellas from the roller under the voltage Separate lamellas lamellas and roller are separately insert to one by one into each of the roller down Get lamellas by the snaps together at an angle of 90 degrees snap lamellas are connected and straight 7 closed door 6 separate installation of lamellas on the roller insert turn over ...

Страница 22: ...260159 DIČ CZ29260159 tel 420 547 427 011 www somati system cz 20 14 INSTALLATION OF THE SIDE GUIDES COVER You can install before but since it works with the guides it is good to have uncovered guides to the end and the whole installation to add the remaining guides bevelled top ...

Страница 23: ...placement parts and additional editing the warranty period is six months but at least the initial warranty period Guarantee claims are only valid for the country in which the door was purchased The goods must come from channels of distribution which was established by us The warranty claim is valid only for damage to the subject matter of the contract Purchase document is valid as proof of warrant...

Отзывы: