16
/
23
3.1.3 Pull out the battery pack and stand it upright. Check if the battery pack is
damaged.
3.1.4 All the other items are contained in a box in one corner of the carton. Take
them out and check if any item is missing
3.1.5 Keep the carton for future storage or transportation
3.2 Packing lists
The following table lists the numbers of each item included. If anything is
damaged or missing, contact Soluna or your distributor
.
Item
Name
Qty
(pcs)
Remark
1
Soluna 6K Pack HV (L-E)
1
2
PE wire
1
3
Allen wrench
(
M2.5
)
1
4
M4 socket head combination screws
4
5
M6 Phillips head three combination screw
10
6
M8 expansion screw combination
8
7
Wall bracket
1
8
CAN communication wire
1
9
User manual
1
10
Wi-Fi stick
1
11
Wi-Fi cable
1
3.3 Installation materials
These installation materials shall be prepared by installers.
●
Charging cables
●
Network cables
●
DC breaker
3.4 Installation location
Please make sure that the installation location meets the following conditions:
●
The building is designed to withstand earthquakes.
●
The location is far away from the sea, to avoid salt water and humidity.
●
The floor is flat and level.
●
There are no flammable or explosive materials nearby.