
V.ACconnection
DANGER
▪Allelectricalinstallationsmustbedoneinaccordancewithalllocal
and
nationalrules.
▪MakesurethatallDCswitchesandACcircuitbreakershavebeendiscon-
nectedbeforeestablishingelectricalconnection.
Otherwise,thehigh
voltagewithintheinvertermayleadto
electrical
shock.
▪Inaccordancewithsafetyregulations,theinverterneedbegroundedfirmly.
Whenpoorgroundconnection(PE)
occu
rs,theinverterwillreportPE
groundingerror.
Please
checkandensurethattheinverterisgrounded
firmlyorcontact
AISWEI
service.
1.ACcablerequirementsareasfollows.I
nserttheconductorintoasuitableferrule
acc.toDIN46228-4andcrimpthecontact
.
2.LoosentheswivelnutofACconnector.
Insertthecrimpedconductorsinto
correspondingterminalsandtighten
screwswiththescrewdriver.
Screwdriver
type
:
PH1
,
torque
:
0.8Nm
Object
Description
Value
A
Externaldiameter
B
Copperconductorcross-section
C
D
Strippinglengthoftheinsulatedconductors
Strippinglengthofthe
cable
outersheath
10
-
16mm
2.5-
6mm
2
13mm
53mm
ThePEconductormustbe
5
mmlongerthantheLandNconductors
.
3.Inserttheadaptertothesocketelement,
stuffthesealringintotheadapterand
tightentheswivelnut.
4.PlugtheACconnectorintothesocketfor
theACconnection.
5.Ifrequired,
you
can
connect
a
second
protective
conductor
as
equipotential
bonding.
Customerprovided,type
:
M4
Groundingcable
Copperconductorcross-section:
2.5
-
6mm
Object
Explanation
OT
terminal
lug
M4
×
10
screw
Screwdriver
type
:
PH2
,
torque
:
1
.
6Nm
2
3
E
N
G
L
IS
H
A
B
C
D
D-5mm
PE
L1
L2
L3
N
1
2
1
2
3
P E
N
3
2
1
Содержание ASW10000-T
Страница 35: ......
Страница 36: ...www aiswei tech com P N 540 30129 02 Date 2020 11 20 ...