User Manual UM0016_ASW 25K-40K-LT-G3_EN_V02_0622 23
5.4 AC Connection
5.4.1 Conditions for the AC connection
Cable Requirements
The grid connection is made using 5 conductors (L1, L2, L3, N,
and PE). We recommend the following requirements for stranded
copper conductor.
1. YJV or YJVR copper cable is recommended.
2. If using aluminum wire, please contact our service department.