
FastRack
510
TM
Installation Manual
2.
Install Grounding Mid-Clamp
between
modules
N
S
W
E
1.
Attach Grounding Mid-Clamps (SMC) into the cage nuts where shown using the 3” bolt (B3) and
lock washer
(L).
2.
Ensure that the teeth of the Grounding Mid-Clamp (SMC) are securely attached onto the top
surface of the module frame and that the bolt is tightened to 10 lbs/ft of
torque.
Please
Note:
Only one Grounding Mid-Clamp needed per
module
1.
Sollega
Inc.
Toll free: 855-725-RACK (7225) |
info@ sollega.com
|
www.sollega. com