
.25.
.26.
6. Operation
6.5.2 Grid ON/OFF
This function is used to start up or stop the power generation of Solis Single Phase
Inverter (see Figure 6.16).
Grid ON
Grid OFF
Figure 6.16 Set Grid ON/OFF
Screens can be scrolled manually by pressing the UP/DOWN keys. Press the ENTER key
to save the setting. Press the ESC key to return to the previous menu.
6.5.3 Clearing Energy
NOTE:
Please, set "Grid ON" to start up the inverter after the settings (refer to
Section 6.5.2). Otherwise the inverter won't start up.
Solis Single Phase Inverter does not require any regular maintenance. However, cleaning
the dust on heat-sink will help the inverter to dissipate the heat and increase its life time.
The dust can be removed with a soft brush.
CAUTION:
Do not touch the inverter's surface when it is operating. Some parts of the inverter
may be hot and cause burns. Turn off the inverter (refer to Section 5.2) and wait for
a cool-down period before before any maintenance or cleaning operation.
The LCD and the LED status indicator lights can be cleaned with a damp cloth if they are too
dirty to be read.
NOTE:
Never use any solvents, abrasives or corrosive materials to clean the inverter.
8. Trouble Shooting
The inverter is designed in accordance with the most important international grid-tied
standards and safety and electromagnetic compatibility requirements. Before delivering to
the customer, the inverter has been subjected to several tests to ensure its optimal operation
and reliability.
In case of failure, the LCD screen will display an alarm message. In this case, the inverter
may stop feeding into the grid. The failure descriptions and their corresponding alarm
messages are listed in Table 8.1:
7. Maintenance
Содержание Single Phase Inverter
Страница 16: ...G83 2 DC Switch Optional G83 2 DC Switch Optional...
Страница 17: ...G59 3 DC Switch Optional 31 32 G59 3 DC Switch Optional...
Страница 18: ...G59 3 DC Switch Optional 33...