background image

NOTICE

It is the job of the AFTER SALES DEPARTMENT to see to the due replacement of faulty sections:

-

either under the responsibility of the supplier when, in spite of our best efforts, faulty or non-compliant
sections have been supplied

-

or under the responsibility of the customer due to faulty handling or through inappropriate maintenance.

BEFORE INSTALLATION

When receiving the pack, you have to check if all pieces and their numbers comply with the list "SAV", and to
see if all pieces are in good condition. It is strongly recommended not to begin installation before checking this

list of pieces. It is also recommended to install the product on a concrete slab. A different surface is possible,
but assure yourself the product is installed level and with all correct angles. Very important is to let the wood
'live': natural swell and shrinkage must not be blocked (watch out with cupboards, racks, rails,...)

UNDER THE RESPONSIBILITY OF THE SUPPLIER

Non-conformity is to be established by the customer, duly notifying us within 10 working days following receipt

of the kit. Applications will only be met upon presentation of the faulty section at the shop where
the garden shed was purchased.
 If the sections are unavailable to be presented, the customer is allowed to

provide photographic evidence, clearly showing the problem. Sections already mounted or assembled and

subsequently found to be faulty or non-compliant cannot be imputed to the supplier. At all times, applications
are required to be accurately stated and to have been compiled in a single effort by the shop where the garden
shed was sold, using the purpose-provided document. In doing so, it is compulsory for the manufacturing

number to be listed. Any replacement sections will be supplied free of charge, either directly to the customer's
home address or to the shop. If a second application should be submitted, the replacement sections will be

delivered directly to the shop where the garden shed was sold.
In all cases, the supplier reserves the right, should he so wish, to verify the legitimacy of any
applications, or the lack of elements at his charge which would serve to corroborate that he is

liable for the problem as found.

SHOWN ON THE FIRST PAGE OF THE ASSEMBLY INSTRUCTIONS, TO BE LISTED IN ANY

APPLICATION ADDRESSED TO THE After Sales Department.

DUE ACCOUNT MUST BE TAKEN OF THE FOLLOWING :

Wood is a living, breathing material. In dry weather conditions, cracks and tears may appear in the planks
which vanish when weather conditions become more damp.

are wholly acceptable as falling within industry-accepted tolerance margins:

-

knots in the wood

-

knots standing proud from the wood surface with a maximum 2 cm cross- section

-

knots standing proud from the sawing edge of the planks provided that the resulting holes are closed by

assembly

-

discoloration or fading (does not detract from the wood's life span)

-

straight tears and cracks, provided these are not wide open cracks transecting the plank

-

tears and cracks at the far tips of the planks, provided the cracks do not exceed the width of the girders or
the planks

-

cracks and tears as a result of shrinkage or desiccation, which do not jeopardise the solidity of the
construction

-

the appearance of resin over a maximum 5 cm length

-

torsion and warping, provided this does nothing to impede assembly.

In dry weather conditions, it is possible for knots to stand proud. Any holes thus formed are to be filled using

wood filler.

Содержание S8216

Страница 1: ... the shop can carry out a first control Also communicate the following bar code beginning with PO or mention it in your After Sale Service document in the field provided This information is needed in order to handle your claim una foto y el documento SAV que se encuentra en el plano de montaje a fin de que en la tienda se pueda realizar el primer control mencionarlo en el lugar correspondiente en ...

Страница 2: ...les Service Formular zu kleben oder Bearbeitung einer Beanstandung unentbehrlich Vergeet niet de barcode beginnend met PO mee te nemen of ze te vermelden op het SAV document op de voorziene plaats Al deze zaken zijn onontbeerlijk en dus noodzakelijk voor de behandeling van uw klacht NL F GB ES P D Veuillez transmettre le code PO ou le mentionner dans votre document SAV indispensables au traitement...

Страница 3: ...ijn geformuleerd en in dat wij daartoe speciaal ter beschikking stellen Het fabricatienummer dient verplicht te worden vermeld De beschadigde stukken worden gratis geleverd hetzij thuis bij de klant zelf of bij de winkel Indien een 2e aanvraag zou worden geformuleerd worden de vervangstukken automatisch geleverd aan de winkel waar het tuinhuis werd aangekocht In alle gevallen behoudt de leverancie...

Страница 4: ... gekozen systeem het natuurlijke krimpen en uitzetten van het hout in functie van de seizoenen toe te laten Het is dus van groot belang dat de structuur nooit wordt geblokkeerd Indien het artikel in koude temperaturen of met grote wind gemonteerd wordt kan het eveneens voorkomen dat u de eventueel bijgeleverde dakbedekking licht dient te verwarmen bij de montage ervan Indien u dat wenst kan u de r...

Страница 5: ...VANT LE MONTAGE pas fixer entre elles les planches constituant la structure de l abri rails lui du colis LES NOTIONS SUIVANTES SONT A PRENDRE EN COMPTE humide Fentes droites si celles ci ne sont pas ouvertes et ne traversent pas la planche ...

Страница 6: ...AVERTISSEMENT DELAIS RESPONSABILITE articles qui ne figurent plus dans sa gamme CONSEILS LA GARANTIE ...

Страница 7: ...ovided document In doing so it is compulsory for the manufacturing number to be listed Any replacement sections will be supplied free of charge either directly to the customer s home address or to the shop If a second application should be submitted the replacement sections will be delivered directly to the shop where the garden shed was sold In all cases the supplier reserves the right should he ...

Страница 8: ...tomers are strongly recommended to ensure a solid ground anchoring In all cases the system chosen is to allow for the natural swell and shrinkage of the wood in consideration of the weather seasons It is imperative that the structure is never obstructed as such When installing the product in cold temperatures or strong wind it might be helpful to slightly heat the roofing when installing it if del...

Страница 9: ... DE MONTAJE SE DEBE MENCIONAR OBLIGATORIAMENTE EN CADA SOLICITUD QUE SE DIRIJA A DNV La madera es una materia viva Con tiempo seco se pueden formar grietas y rendijas entre las planchas Con la madera es normal que aparezcan ciertas irregularidades Por estas razones las siguientes nudos en la madera de esta manera sean recubiertos durante el montaje grietas y rendijas rectas siempre y cuando no se ...

Страница 10: ...abilidad del proveedor solamente puede ser invocada cuando se ha seguido estrictamente el plano de montaje En el marco de la responsabilidad del cliente Cada solicitud de reemplazo de piezas que al momento del montaje estuvieran en mal estado o que aunque facturada Lo mismo se aplica en caso de no respetar las instrucciones de montaje o para aquellas solicitudes que no se realizaran dentro de los ...

Страница 11: ...Em qualquer caso o fornecedor reserva se o direito de verificar a legitimidade do pedido ou a falta de elementos comprovativos contra ele que motivem a responsabilidade dele pelo problema constatado tapados durante a montagem vigas ou das pranchas pasta para madeira ...

Страница 12: ...ABILIDADE facturado Aplique a velatura com a devida regularidade utilizando os produtos apropriados montagem ou de armazenamento a Solid reserva se o direito de faturar ao cliente um custo fixo pelo valor do produto ...

Страница 13: ...te del magazzino che ha Production Order I pezzi difettosi verranno recapitati gratuitamente al domicilio del cliente o nel magazzino Se si dovesse acquistata la casetta DI ASSISTENZA POST VENDITA TENER CONTO DEI SEGUENTI ELEMENTI quando fa umido anomalie venga ricoperto scolorimenti non nocciono alla durata di vita del legno fessure diritte se non sono aperte e se non attraversano l asse fessure ...

Страница 14: ...ti deteriorati nel montaggio o causa di elementi anche in caso di inosservanza delle istruzioni di montaggio o per le richieste formulate oltre il termine CONSIGLI spetta al montatore assicurarsi che la casetta non rischi di essere trascinata via dal vento A tal fine si tutta la sua altezza con l ausilio del kit tempesta in dotazione o disponibile a magazzino a seconda dei modelli In ogni caso il ...

Страница 15: ...t Planung nach Lieferung Fundament Streifenfundament Betonplattenfundament Lassen Sie sich ggf von einem Fachmann beraten bzw lassen Sie das Fundament von einem Fachmann erstellen Lagerung bis zur Montage Das Produkt besteht aus hochwertigem Fichtenholz und wird unbehandelt geliefert einem geheizten Raum aufbewahren Vorbereitung Pflege Holzschutz auch im Innenbereich ausreichend mit einem feuchtig...

Страница 16: ...keinen Reklamationsgrund darstellen Risse Trockenrisse die nicht durchgehend sind und nicht die Konstruktion beeinflussen bzw Baumkante enthalten Bereits verbaute oder gestrichene Bauteile sind von der Reklamation ausgeschlossen anfallenden Kundendienstkosten in Rechnung stellen Abschluss der Reklamation aufbewahrt werden Wir behalten uns das Recht vor die Reklamation beim Bedachung Dachrinnen Bei...

Страница 17: ...by rovina eva eny hluboko p Pro kone prostoru pov trnostn evo proti vlhkosti a slune lazura m ...

Страница 18: ... fotografiemi oblinky servis Krytina Okapy ami konstrukce domku apod ...

Страница 19: ...uerta Apertura delle porte Abertura de portas Breedte Largeur Width Anchura Boca Larghezza 780 Hoogte Hauteur Heigth Altura Altezza Altura 1692 786 1692 1 40 3420 2440 CreateDate 15 11 2014 SaveDate 23 11 2014 PlotDate 23 11 2014 Industriepark 8 8587 Spiere Helkijn 1902 352 180 6 05 5 77 1902 352 ...

Страница 20: ...S8216 2955 3011 2245 1955 2011 1 40 3420 2440 CreateDate 15 11 2014 SaveDate 23 11 2014 PlotDate 23 11 2014 Industriepark 8 8587 Spiere Helkijn 1902 352 180 1902 352 25 28 ...

Страница 21: ...ment SAV figurant dans le plan de indispensables au traitement de votre Veuillez lire attentivement les remarques ci dessous ENTRETIEN fois par an un espace entre les planches Ceci n est que temporaire car le bois reprend sa forme originale par mais disparaissant lors du montage du chalet chalet et dont la longueur poutre l autre n affectant pas la construction Voilage ou cintre n affectant pas le...

Страница 22: ...ellen oder Problemen an den bei dem Sie Ihr Blockhaus gekauft haben und nehmen Sie die Teile oder ein Foto davon sowie das SAV Dokument das Sie im Montageplan finden mit sodass ihr das Problem untersuchen kann Bitte denken Sie auch an unten stehenden Barcode beginnend mit PO Nehmen Sie diesen ebenfalls mit oder geben Sie ihn an der vorgesehenen Stelle auf dem SAV Dokument an Oben genannte Informat...

Страница 23: ...W016x095 PLA 000 0 WW040x120 4FA 000 0 180 6 K1 WW040x120 PT1 000 0 3360 1 K WW016x072 2R8 000 0 352 8 M2 WW028x048 4FA 000 0 WW016x90 4FA 000 0 WW058x90 B1G CPO 0 WW016x095 PLA 000 0 3392 8 M WW016x095 PLA 000 0 2376 8 M1 S8038 1 x P1 40 x 55 x 1870 1 x P2 40 x 55 x 786 1 x P3 40 x 55 x 1870 2 x P4 1 x S3 1 x ALU 20x60x786 WHITE PLEXI 465x650 P 1 H 1 3036 S1 1 3036 M3 8 230 J 39 2320 F1 2 3360 F ...

Страница 24: ... SAV PO_ _ _ _ _ _ _ _ _ _ _ _ _ _ S8216 SET 1 S665 R 80 x 72 x 2090 S691 L 1 V 80 x 72 x 2090 S691 R 1 V1 80 x 72 x 1958 S692 L 1 V2 80 x 72 x 1958 S692 R 1 V3 1 M8 x 50 2 M8 2 M8 2 3 x 30 80 2 5 x 40 140 2 5 x 16 120 M6 x 40 16 M6 16 3 x 40 8 3 x 60 2 3 x 70 4 4 x 16 8 4 x 70 2 5 x 90 16 ...

Страница 25: ......

Страница 26: ...1 S8216 2 3 E G V3 E B B 12 E 24 G 12 E E 2 V1 C E G G 1 V V2 V1 1 V2 1 C 12 V 1 V3 1 M6 x 40 8 B C B 1 C 1 M6 8 ...

Страница 27: ...4 S8216 5 A A A 1 F1 F A1 1 F1 2 F1 F 1 M6 x 40 8 6 K H 1 H K 1 3 0x70 4 M8 x 60 2 M8 2 M8 2 M6 8 ...

Страница 28: ...7 S8216 P1 P2 P3 S665 R 2 P4 4 0 x 70 S3 5 0 x 90 2 P4 P1 1 P2 1 P3 1 S3 1 P4 2 3 0 x 30 P4 5 0 x 90 786 ALU 20x60x786 3 0 x 60 4 0 x 16 4 3 0x30 4 4 0x70 2 3 0x60 2 4 0x16 8 5 0x90 4 2 ...

Страница 29: ...8 S8216 K1 6 1200 1200 750 750 1200 1200 J 39 117 S1 1 S1 3 0 x 40 8 5 0 x 90 12 ...

Страница 30: ...S8216 M 4 9 10 M1 4 M 4 M1 4 M1 M M1 M 3 0 x 30 44 ...

Страница 31: ...11 S8216 12 O 3x3380 L 5 M3 4 1 2 3 3380 1000 M2 8 M2 M3 L L L L L M2 M2 M2 20 3 0 x 16 120 3 0 x 30 32 ...

Страница 32: ...S8216 ...

Отзывы: