5.1 Siting the internal unit
•
The installation site must be level and sufficiently load-bearing (at least 450 kg).
•
The installation site must be able to bear the load of the ventilation unit without vibrations on a long term basis.
•
Site the appliance in a room that is free from the risk of frost.
>>
A clearance of at least 750 mm for the CPL-1400 and 950 mm for the CPL-2400, CPL-3300, CPL-4700 and CPL-6100 is
required in front of the appliance to be able to open the inspection doors. Approx. 700 mm clearance is necessary
above the unit for air duct connections.
>>
Level the unit horizontally (align using the adjustable feet).
>>
Provide drain outlet for draining off the condensate.