6.3.2 Landscape installation
Mounting the lower module end clamps for landscape
installation
•
Fix two module end clamps per module to the lower
base rail.
•
Insert the Quickstone of the end clamp into the side
channel of the rail and fasten loosely.
•
The distance between the clamps should be based on
the optimal clamping points of the respective module
specified by the manufacturer (usually marked by the
drill holes in the module frame, approx. ¼ of the
module length from the right and the left).
Module positioning
•
Place the module in landscape position onto the
loosely mounted lower module end clamps.
•
Align the modules. It is not necessary to leave any
space between the individual modules.
•
Adjust the height of the lower module end clamp by
means of the slotted hole so that the clamp lies
directly on the module. Finally tighten the clamps in
this position (tightening torque 8 Nm).
Mounting the upper module end clamps
•
Make sure that the upper edge of the upper rail row
is flush with the modules and that the side rail
channels and the X-stones point upwards (see
illustration page 12, point 3). If necessary, correct
the positioning of the base rail.
•
Mount two end clamps per module to the upper base
rail, parallel to the positioning of the lower end clamps
and tighten finally (tightening torque 8 Nm).
1
2
3
Material damage due to improper
mounting
•
Improperly mounted module end
clamps may slip or rip out.
•
All Quickstone connections must be
mounted according to instructions.
•
After installation, ensure that the
bolted connections are tight.
CAUTION
|
15