 X3-Matebox 

advanced

 side connection

5. Monitor the antenna connections of accessories

6.Wiring

 

Connection

3

6.1 Inverter side connection

 - Grid(INV) and EPS(INV)

N16

E-bar

Grid

6.

3

 Ground wire connections

The box needs to be grounded as follows.

BAT(+)/BAT(-)

To battery

-

+

 - Grid and Load and Battery

Grid(R/S/T/N)

Load(R/S/T/N)

Grid(R/S/T/N)

Load(R/S/T/N)

L=12mm

L

L

L=

12

mm

Grid(INV)

Grid(INV)

R S T N

2122 23 24

EPS(INV)

Grid(INV)

17

18

19

20

PE

N

N26

R S T N

2122 23 24

EPS(INV)

Grid(INV)

17

18

19

N20

PE

 I 

 I 

6.

4

 The N-line on the Grid side is short circuited to the N-line on the EPS side

II

B

R S T N

2122 23 24

EPS(INV)

Grid(INV)

17

18

19

20

PE

N

N

25

N26

N-wire connector(130mm,

)

 6 mm²

25 26

EPS(INV)

25 26

EPS(INV)

2324

2122

Refer to 6.2

L1

C

L=L1+3mm

C

L=L1+3mm

L1

Diagonal Plier

Grid (PE)

Hexagon keys
Torque: 1.5±0.2N

·

m

-If the user requires wiring rules for neutral wires the standby power supply cannot be isolated or 
switched (for wiring Australia and New Zealand regulations AS/NZS_3000:2012)

320102048901

3

) Pass the Grid/Load line through the Grid/Load port of the X3-Matebox 

advanced

, then  nd the 

Grid(R/S/T/N) port and Load (R/S/T/N) ports  in the X3-Matebox 

advanced

, insert each line, and use the 

screwdriver to lock the screws.

4

) Pass the battery power wire through the BAT port of The X3-Matebox 

advanced

, then  nd the 

B

AT+ and BAT- ports in the X3-Matebox 

advanced

, insert each wire accordingly, and use the 

screwdriver to lock the screws.

6.5 Finally, use the screwdriver to install the baffle back, close the upper cover  
and lock 

the buckle with a key.

b) Grid(PE) strip the grounding cable insulation(length”L’’), insert the stripped cable into the R type 
terminal, and then clamp it.

2) Grid(R/S/T/N/PE) /Load(R/S/T/N) side connection
a) Prepare ordinary

 1

0mm² Grid(R/S/T/N/PE) /10mm² Load(R/S/T/N)  

and

 remove the 12mm insulation 

layer at the end of the wire. Insert the European-style terminals respectively. 
The stripped terminals must be inserted into the European-style terminals and  nally pressed down 
with the crimping pliers.

Note: According to the di

erent N terminals of Grid(INV ), select the corresponding 

connection position.(if need:(A + 6.4B) or (I + 6.4II))

1) Connect the Grid(INV ) R/S/T/N and EPS (INV ) R/S/T/N/PE ports of the inverter to the X3-Matebox 

advanced 

port. The connection method is as follows :

a) First, insert the R/S/T EPS(INV ) into the R/S/T port of EPS (INV ) in X3-Matebox 

advanced

 and the N 

EPS(INV ) directly into the hole, directly into the hole and ensure that the installation is tight ;
b) Then  nd the Grid(INV ) (R/S/T ) port in X3-Matebox 

advanced

, connect the corresponding wire 

harness, and lock the screw with a screwdriver.
C) Finally, lock the PE wire/N wire with a hexagonal keys;

According to the BAT(INV )+/BAT(INV )- line symbol on X3-Matebox 

advanced 

harness, the corresponding 

ports of BAT+/BAT- of the inverter are successively inserted.

There is an antenna in the box of monitoring accessories.
a) Install the antenna on the box and tighten it by hand;
b) Then connect the antenna cable to the end of the WiFi 

Dongle

.