background image

Packing List

Quick Installation Guide

Solax Box 3.0 

Wi-Fi antenna x1

I

Battery Installation

BMU Installation

Wi-Fi connector x1

Quick Installation Guide x1 

Warranty card x1 

item

item

Expansion tubes x2 
Expansion screws x2

M6 washers x2 

item

item

item

Bracket x2
Battery Guard x1 

item

item

item

BMS cable  x1 

item

Box Installation

-

 Tighten

 

the

 

expansion

 

tubes.

-

 Pass

 

the

 

expansion screws though the M6 washers,

then screw the expansion screws. 

-

 Place Solax Box 3.0 against the ground.

-

 Drill holes with

φ

10 drill.

-

 Depth: at least 50mm

Connectors inside the Box

+

-

-

 Overview of connectors inside the Solax Box 3.0.

(Wiring of the connectors inside the box has been completed upon delivery.)

item

item

item

LG Connectors
 X 2 pairs

BAT Connector

Pv1-
Pv1+

Pv2-
Pv2+

EPS Connector

AC Connector

+

-

Application

Application

Connectors

Connectors

Notes:

-

 Affix the empty box on the wall  rst before proceeding any installation. It will be too dangerous to move as the box  tting with batteries and inverter will      

overweigh box-handle’s bearing limit.

-

 Clean or replace the ventilation  lters every three months. 

CAN/RS485

CAN2

CAN/RS485

CAN2

CAN/RS485

CAN2

CAN/RS485

CAN2

CAN2

SWITCH

-

 Connect LG connectors 

into the jacks on the battery.

For

 

one

 

battery

For

 

two

 

batteries

   (in parallel)

Find

 

 cable in

BMS

 

Solax 

Box 3.0 packaging

.

-

 Insert the “LG-Bat” side of 

the “BMS” cable into the “CAN/
RS485" port on the battery
(The “Solax” side is to be related
 to BMU in chapter V).
 

-

 Find intra-rack network

 

cable in 

battery packaging

.

-

 Insert it into “CAN2" ports 

on the batteries respectively. 

Place the battery into the Solax Box 3.0.

-

 Install the battery guard.

Solax Box 3.0 can be equipped with two models of batteries respectively.

M48063P3S

M48126P3S

Battary

Nominal 

Voltage

Nominal

Capacity

Dimension

51.8V

51.8V

63Ah

126Ah

M48063P3S

445*110*338.8mm

445*110*586.6mm

M48126P3S

Nominal 

Energy

3.262kWh

6.524kWh

Maximum

Current

63A

63A

CAN/RS485

CAN2

item

item

item

LG-Bat

LG-Bat

-

 Insert the key.

-

 Open the door.

-

 If the space is too narrow to fully open the door,  you are 

able to remove the door. Please note that the door can only 
be removed when opened 30 degrees or more.

Dismantle the ground wire before removing the door.

Remove the safety bezel.

30

°

Communication:

-

 Find the BMS cable which has 

been connected to the Battery
(chapter IV ).

-

 Insert the “Solax” side of BMS 

cable into the “BMS” port on the 
BMU.

Battery Power Supply

:

-

 Find BAT Connector inside the box (chapter III).

-

 Insert BAT connector into “BAT” port on the 

BMU.

-

 Connection

 

between

 

BMU and

 

Battery

 (Wiring of BMU side).

-

 Match the BMU with bracket.

Communication

:

-

 Find CAN connector in 

BMU Packaging

.

-

 Insert one side of the connector into “CAN” 

port on the BMU (The other side is to be related 
to SK

-

TL in chapter VI).

BUS

 

Connection:

-

 Find BUS Connectors in 

BMU Packaging

.

-

 Connect

 

BUS connectors to “BUS” port on the 

BMU (The other side is to be related to SK

-

TL in 

chapter VI).

-

 Connection

 

between

 

BMU and

 

SK-TL

 (Wiring of BMU side).

BAT Connector

Sola

x

item

Corrugated Tubing  x1 

item

Отзывы: