Decommissioning

7

.

1

 

Dismantling the Battery

Shutting down T-BAT system
Disconnect the cables between BMS and 

i

nverter

Disconnect the short-circuit plug on the last battery module
Disconnect the cables.

7.2  

Packing

Please pack the BMS and battery modules with the original packaging.
If it is no longer available, you can also use an equivalent carton that meets the 
following 

requirements:

Ÿ

Suitable for loads more than 70kg

Ÿ

With handle

Ÿ

Can be fully closed

7. Decommissioning

7. Decommissioning

Maintenance and Warranty

8

.

1

Maintenance

If the ambient temperature 

for storage

 is -

20

~

55°C

, recharge the batteries 

at least one time every 3 months

.

If the ambient temperature 

for storage

 is -

20

~

20°C

, recharge the batteries 

at least one time every 6 months

.

8.2  

Warranty

SolaX

 protects this product under warranty when it is installed and used

 as listed 

  

in this manual. Violation of installation procedure or use of the product in any  
way not described in this manual will immediately void all warranties on the   
product.
SolaX

 does not provide warranty coverage or assume any liability for

 

direct  

or indirect damages or defects that result from the following causes:

Force majeure (

ooding,

 lightning strike, overvoltage,  re, 

thunderstorm,  ooding 

etc.)

Improper or noncompliant use
Improper installation, commissioning, start up or operation (contrary to the 
guidance detailed in the installation manual supplied with each product)
Inadequate ventilation and circulation resulting in minimized cooling and 
natural air  ow
Installation in a corrosive environment
Damage during transportation
Unauthorized repair attempts
Failure to adequately maintain the equipment. 

An on-site inspection by a

quali ed technician is possible following 60 months of continuous use.
Warranty claims made beyond 60 months from date of commissioning may 
be declined if it cannot be demonstrated that the equipment has been 
adequately maintained 

External in uence including unusual 

physical

 or electrical stress (power failure  

surges, inrush current, etc.)
Use of an incompatible inverter or devices

Ÿ

Ÿ

Ÿ

Ÿ
Ÿ

Ÿ

Ÿ

Ÿ

Ÿ

Ÿ

3

9

Содержание HV11550

Страница 1: ...to Solax Power Network Technology Zhe jiang Co Ltd SolaX Power Co Ltd Any corporation or individual should not plagiarize partitially or fully copy including software etc and no reproduction or distri...

Страница 2: ...D BATTERIES 5 2 3 QUALIFIED INSTALLER 6 3 PRODUCT INTRODUCTION 3 1 PRODUCT OVERVIEW 7 3 1 1 DIMENSION AND WEIGHT 7 3 1 2 APPEARANCE 8 3 2 BASIC FEATURES 3 2 1 FEATURES 10 3 2 2 CERTIFICATIONS 10 3 3 S...

Страница 3: ...are valuable for the optimal operation of your product T BAT H 5 8 NOTE There are 4 models for T BAT system including BMS and battery packs Please refer to section 3 3 1 T BAT SYS HV Con guration List...

Страница 4: ...y be used in the household energy eld It is not allowed to be used in other industries such as the medical equipment industry and automotive application industry WARNING Please don t crush or impact t...

Страница 5: ...ediately Eye contact Rinse eyes with fowing water for 15 minutes and seek medical attention immediately Dermal contact Wash the a ected area thoroughly with soap and water and seek medical attention i...

Страница 6: ...ack s HV11550 Battery Pack T BAT H 5 8 Length Width Height Weight T BAT H 5 8 HV11550 474mm 193mm 708mm 72 2kg 474mm 193mm 647mm 68 5kg 3 Product Introduction 708 474 193 647 193 474 A skilled worker...

Страница 7: ...o RS485 I of next battery pack Power Connector to XPLUG of next battery pack or to of the same pack Air valve BAT BAT CAN YPLUG RS485 II XPLUG RS485 I YPLUG RS485 II Power Connector to of upper batter...

Страница 8: ...BAT H 5 8 1 HV11550 2 T BAT H 5 8 1 HV11550 3 5 8 11 5 17 3 23 0 100 131 200 262 300 393 400 524 T BAT H 5 8 HV11550 Dimension mm Weight kg Nominal Voltage Vdc Operating Voltage Vdc Nominal Capacity...

Страница 9: ...y incorrect assembling and operation NOTE The Triple Power battery is rated at IP55 and thus can be installed outdoors as well as indoors However if installed outdoors do not expose the battery direct...

Страница 10: ...over plate2 Wall bracket M5 screw Expansion bolt Ring terminal for grounding Power cable disassembling tool Quantity 1 1 1 1 2 8 2 1 1 5 2 1 L HV11550 Quantity Object A1 B1 C1 D1 E1 F1 G1 H1 I1 J1 Des...

Страница 11: ...ugh at least 50mm for installing and tightening the expansion bolts J or I1 Install the expansion bolts in the wall and tighten the screws on the bracket by using the screw driller Step 2 Match the ba...

Страница 12: ...Connect for T BAT H 5 8 or for HV11550 on the right side V VI to on the left side of the next battery pack II 2 Connect YPLUG for T BAT H 5 8 or for HV11550 on the right side to VI VII XPLUG on the le...

Страница 13: ...is going to connect power cables between inverter and T BAT system The default length of power cables are 2 meters so customers can appropriately cut the cable according to the actual installation env...

Страница 14: ...bles when the T BAT system is not turned o otherwise there would be an arc discharge that could cause serious injury CAUTION Disassembling Power cable on BAT BAT XPLUG port 22 23 4 Installation 4 Inst...

Страница 15: ...H CAN_L A1 B1 4 5 4 Connecting RS485 Communication Cable For T BAT H 5 8 There s no need to use RS485 communicaton cable For T BAT H 5 8 1 3 battery packs Connect RS485 II for T BAT H 5 8 or for HV115...

Страница 16: ...6 Overall Installation It is recommended to protect the cables with corrugated pipe For T BAT H 5 8 1 Connect all the cables on the left side of T BAT H 5 8 2 Run the cables through the corrugated pip...

Страница 17: ...the series connected cable at and YPLUG on the right side of the last battery pack to complete the internal circuit CAUTION One T BAT system is allowed to install one T BAT H 5 8 with three battery pa...

Страница 18: ...ching T BAT H 5 8 5 Matching T BAT H 5 8 1 HV11550 6 Matching T BAT H 5 8 2 HV11550 7 Matching T BAT H 5 8 3 HV11550 Black start con guration 5 Commissioning 5 Commissioning NOTE When powering on the...

Страница 19: ...ther charging nor discharging the indicator lights are o When the battery pack is charging part of the Blue LED is fashing with the frequency of light on for 0 5s light o for 0 5s and part of the Blue...

Страница 20: ...T BAT system A warning state is triggered by a condition for example when voltage or temperature is beyond the designed limitations The T BAT system s BMS periodically reports its operating state to t...

Страница 21: ...while BMS_CapMismatch_Fau lt The capacity of battery packs are di erent BMS_SlaveSwVer_Mism atch_Fault The software betwen slavers are di erent BMS_SlaveSw HwMism atch_Fault The hardware is di erent...

Страница 22: ...way not described in this manual will immediately void all warranties on the product SolaX does not provide warranty coverage or assume any liability for direct or indirect damages or defects that re...

Отзывы: