background image

Step 5:

 Select a suitable Fan Motor Assembly location 

approximately 3 to 4 feet (1 m) from intake hole toward roof 
or side-wall vent. Fan Motor Assembly can be installed at any 
angle without affecting performance. The arrow printed on Fan 
Motor Assembly shows airflow direction. Point the arrow away 
from ceiling fixture intake and toward the roof or side-wall vent 

(Diagram E).

 To secure Fan Motor Assembly, screw four (4) 1 

in (25 mm) screws through Mounting Brackets on Fan Motor 
Assembly into building structure.

Step 6: 

Install 150mm piece of flexi air duct from ventilation 

housing to inlet of fan motor 

(Diagram F)

Note: 

For best vent performance, make air duct run as short 

as possible with minimum bends.

Step 7:

 Fit the narrow end of the 150mm x 250mm white 

plastic reducer over end of vent duct running from the fan 
motor, and secure with foil tape 

(Diagram G).

 

Step 8: 

Then place 150mm x 250mm reducer at the top 

of turret opening in roof flashing, and secure with foil tape 

(Diagram H)

.

IMPORTANT NOTICE

250 Terracotta Flashing/Vented
Fit and secure the extension turret ring to the turret of the 
flashing before proceeding with Step 8 - above

Vent Vap Installation

Step 9: 

Drill a 5mm diameter hole in each of the 3 legs, 

10mm up from the end of leg. Place vent cap over top of the 
flashing/fan unit with one leg centred front face of the flashing 
turret.

It may be necessary to cut out a small section on the side of 
vent cap - opposite adjacent the two back legs, to make it 
easier when fixing screws. Using the three pre-drilled holes as 
a guide, drill a 3mm pilot hole into turret of the flashing – then 
secure vent cap with stainless dome screws 

(Diagram I)

.

Diagram F

Diagram G

Diagram H

Diagram I

Diagram E

Отзывы: