1
UniQube Drain Back
Reservoir
Installation and Operation Manual
Read and understand this manual before
installation, commisioning and operation
Страница 1: ...1 UniQube Drain Back Reservoir Installation and Operation Manual Read and understand this manual before installation commisioning and operation...
Страница 2: ...hen product is in operating mode some parts of it may reach temperature over 51 C It can cause severe burns instantly or death from scalds Children disabled and elderly are at highest risk of being sc...
Страница 3: ...L 650mm Setup and operation procedure The following instructions describe a fast and simple way to commissioning the installation 1 Installation of reservoir and pipe connecting Install the reservoir...
Страница 4: ...once complete filling Idle 2 cm m 2 inclination 5 cm m 5 inclination 5 cm m 5 inclination A B C E I J F G N M Drain Back reservoir UniQube Solar Panels filled Pump On In Operation 2 cm m 2 inclination...
Страница 5: ...Heat Exchanger volume is declared in the technical data of the UniQube hot water tanks The volume of copper or corrugated stainless steel pipes can be read on page 7 Filling Valve pump and Safety Valv...
Страница 6: ...sure the pressure in compressed air is bigger than the pressure in solar circuit 4 Slowly partial open the Leaking Valve and add compressed air slowly until system pressure increases for 0 5 bars 5 C...
Страница 7: ...29m X UniQube DB 440 Liters X 48m 26m 20m 15m Useful notes for the installers The following table shows what is the maximum allowed pipe lenght for your solar thermal drain back system depending on wh...
Страница 8: ...uroterm d o o Lece Koteski 50 Industrial area Biljana Prilep Republic of North Macedonia tel 389 48 419 415 fax 389 48 422 981 e mail info solarico eu GUARANTEE Type Serial number Guarantee Manufactur...